Complicated Time-Constrained Project Scheduling Problems in Water Conservancy Construction

被引:0
|
作者
Zhang, Song [1 ]
Song, Xiaokang [1 ]
Shen, Liang [1 ]
Xu, Lichun [2 ]
机构
[1] Xuzhou Med Univ, Sch Management, Xuzhou 221004, Peoples R China
[2] Xuzhou Med Univ, Sch Publ Hlth, Xuzhou 221004, Peoples R China
基金
美国国家科学基金会;
关键词
resource-constrained; project scheduling; genetic algorithm; water conservancy; GENETIC ALGORITHM; ACTIVITY NETWORK; CRITICAL PATH; RESOURCE; CLASSIFICATION; EXTENSIONS; VARIANTS;
D O I
10.3390/pr11041110
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Water conservancy project scheduling is an extension to the classic resource-constrained project scheduling problem (RCPSP). It is limited by special time constraints called "forbidden time windows" during which certain activities cannot be executed. To address this issue, a specific RCPSP model is proposed, and an approach is designated for it which incorporates both a priority rule-based heuristic algorithm to obtain an acceptable solution, and a hybrid genetic algorithm to further improve the quality of the solution. In the genetic algorithm, we introduce a new crossover operator for the forbidden time window and adopt double justification and elitism strategies. Finally, we conduct simulated experiments on a project scheduling problem library to compare the proposed algorithm with other priority-rule based heuristics, and the results demonstrate the superiority of our algorithm.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] Time-constrained project scheduling
    Guldemond, T. A.
    Hurink, J. L.
    Paulus, J. J.
    Schutten, J. M. J.
    [J]. JOURNAL OF SCHEDULING, 2008, 11 (02) : 137 - 148
  • [2] Tropical optimization problems in time-constrained project scheduling
    Krivulin, N.
    [J]. OPTIMIZATION, 2017, 66 (02) : 205 - 224
  • [3] Time-constrained project scheduling
    T. A. Guldemond
    J. L. Hurink
    J. J. Paulus
    J. M. J. Schutten
    [J]. Journal of Scheduling, 2008, 11 : 137 - 148
  • [4] Time-constrained project scheduling with adjacent resources
    Hurink, J. L.
    Kok, A. L.
    Paulus, J. J.
    Schutten, J. M. J.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 310 - 319
  • [5] The Problems and Countermeasures of Construction Management of Water Conservancy Project
    Jin, Guilong
    Ma, Wei
    [J]. PROCEEDINGS OF THE 2016 5TH INTERNATIONAL CONFERENCE ON SUSTAINABLE ENERGY AND ENVIRONMENT ENGINEERING (ICSEEE 2016), 2016, 63 : 881 - 884
  • [6] A metaheuristic solution approach for the time-constrained project scheduling problem
    Verbeeck, Cedric
    Van Peteghem, Vincent
    Vanhoucke, Mario
    Vansteenwegen, Pieter
    Aghezzaf, El-Houssaine
    [J]. OR SPECTRUM, 2017, 39 (02) : 353 - 371
  • [7] A metaheuristic solution approach for the time-constrained project scheduling problem
    Cédric Verbeeck
    Vincent Van Peteghem
    Mario Vanhoucke
    Pieter Vansteenwegen
    El-Houssaine Aghezzaf
    [J]. OR Spectrum, 2017, 39 : 353 - 371
  • [8] Scheduling time-constrained instructions on pipelined processors
    Leung, A
    Palem, KV
    Pnueli, A
    [J]. ACM TRANSACTIONS ON PROGRAMMING LANGUAGES AND SYSTEMS, 2001, 23 (01): : 73 - 103
  • [9] Scheduling time-constrained communication in linear networks
    Adler, M
    Rosenberg, AL
    Sitaraman, RK
    Unger, W
    [J]. THEORY OF COMPUTING SYSTEMS, 2002, 35 (06) : 599 - 623
  • [10] Efficient scheduling for mobile time-constrained environments
    Femandez-Conde, J.
    Mozos, D.
    [J]. ELECTRONICS LETTERS, 2007, 43 (22) : 1214 - 1215