Complicated Time-Constrained Project Scheduling Problems in Water Conservancy Construction

被引:0
|
作者
Zhang, Song [1 ]
Song, Xiaokang [1 ]
Shen, Liang [1 ]
Xu, Lichun [2 ]
机构
[1] Xuzhou Med Univ, Sch Management, Xuzhou 221004, Peoples R China
[2] Xuzhou Med Univ, Sch Publ Hlth, Xuzhou 221004, Peoples R China
基金
美国国家科学基金会;
关键词
resource-constrained; project scheduling; genetic algorithm; water conservancy; GENETIC ALGORITHM; ACTIVITY NETWORK; CRITICAL PATH; RESOURCE; CLASSIFICATION; EXTENSIONS; VARIANTS;
D O I
10.3390/pr11041110
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Water conservancy project scheduling is an extension to the classic resource-constrained project scheduling problem (RCPSP). It is limited by special time constraints called "forbidden time windows" during which certain activities cannot be executed. To address this issue, a specific RCPSP model is proposed, and an approach is designated for it which incorporates both a priority rule-based heuristic algorithm to obtain an acceptable solution, and a hybrid genetic algorithm to further improve the quality of the solution. In the genetic algorithm, we introduce a new crossover operator for the forbidden time window and adopt double justification and elitism strategies. Finally, we conduct simulated experiments on a project scheduling problem library to compare the proposed algorithm with other priority-rule based heuristics, and the results demonstrate the superiority of our algorithm.
引用
收藏
页数:11
相关论文
共 50 条
  • [41] Research on Support Technologies of the Management Informationisation for Water Conservancy Project Construction
    Wu, Suqin
    Xie, Jiancang
    Ma, Bin
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 12352 - 12355
  • [42] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems
    Liu, Shixin
    Tukel, Oya I.
    Rom, W.
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
  • [43] Time-Constrained Leader-Follower Multiagent Task Scheduling and Control Synthesis
    Yu, Pian
    Dimarogonas, Dimos V.
    IEEE TRANSACTIONS ON CONTROL OF NETWORK SYSTEMS, 2022, 9 (01): : 367 - 379
  • [45] Decentralized Time-Constrained Scheduling for Sensor Network in Identification of Distributed Parameter Systems
    Patan, Maciej
    Romanek, Adam
    STOCHASTIC MODELS, STATISTICS AND THEIR APPLICATIONS, 2015, 122 : 415 - 423
  • [46] Scheduling study for time-constrained wafer fabrication equipments with chamber cleaning operations
    Zhen L.
    Zhang X.
    Yang F.
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2023, 43 (08): : 2395 - 2411
  • [47] Time-constrained workflow scheduling in cloud environment using simulation annealing algorithm
    Jian, Chengfeng
    Wang, Yekun
    Tao, Meng
    Zhang, Meiyu
    Journal of Engineering Science and Technology Review, 2013, 6 (05) : 33 - 37
  • [48] Project cost-quality-risk tradeoff analysis in a time-constrained problem
    Mohammadipour, Faezeh
    Sadjadi, Seyed Jafar
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 95 : 111 - 121
  • [49] TIME WINDOW CONSTRAINED ROUTING AND SCHEDULING PROBLEMS
    SOLOMON, MM
    DESROSIERS, J
    TRANSPORTATION SCIENCE, 1988, 22 (01) : 1 - 13
  • [50] Resource Constrained Project Scheduling of Construction Engineering with Genetic Algorithm
    Wang, Lixing
    Ip, W. H.
    Lee, Carman K. M.
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1466 - 1470