共 50 条
- [41] Research on Support Technologies of the Management Informationisation for Water Conservancy Project Construction 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 12352 - 12355
- [42] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems 2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
- [43] Time-Constrained Leader-Follower Multiagent Task Scheduling and Control Synthesis IEEE TRANSACTIONS ON CONTROL OF NETWORK SYSTEMS, 2022, 9 (01): : 367 - 379
- [45] Decentralized Time-Constrained Scheduling for Sensor Network in Identification of Distributed Parameter Systems STOCHASTIC MODELS, STATISTICS AND THEIR APPLICATIONS, 2015, 122 : 415 - 423
- [46] Scheduling study for time-constrained wafer fabrication equipments with chamber cleaning operations Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2023, 43 (08): : 2395 - 2411
- [50] Resource Constrained Project Scheduling of Construction Engineering with Genetic Algorithm 2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1466 - 1470