Dealing with uncertainty in sewer condition assessment: Impact on inspection programs

被引:13
|
作者
Roghani, Bardia [1 ]
Cherqui, Frederic [2 ]
Ahmadi, Mehdi [3 ]
Le Gauffre, Pascal [2 ]
Tabesh, Massoud [4 ]
机构
[1] Univ Tehran, Coll Engn, Sch Civil Engn, Tehran, Iran
[2] INSA Lyon, DEEP, F-69621 Villeurbanne, France
[3] SINTEF, Oslo, Norway
[4] Univ Tehran, Coll Engn, Sch Civil Engn, Ctr Excellence Engn & Management Civil Infrastruc, Tehran, Iran
关键词
Asset management; Uncertainty; Sewer inspection program; Deterioration model; Condition assessment; VISUAL INSPECTION; DECISION-SUPPORT; DETERIORATION; PERFORMANCE;
D O I
10.1016/j.autcon.2019.03.012
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Sewer condition prediction is a fundamental element of proactive maintenance programs. The prediction relies mostly on the assessed condition of inspected segments, generally based on CCTV reports. However, several sources of uncertainty affect the condition assessment and may lead to inefficient maintenance. The present article focuses on three main questions. 1. What is the impact of uncertainty in assessed condition on the prediction model? 2. Considering uncertainties in the assessed condition, is it necessary to collect data on the characteristics of many segments, or are a small number of influential variables enough to build the condition prediction model? 3. Is it better to overestimate (false positive) or underestimate (false negative) the deterioration of a segment? These questions were evaluated on a semi-virtual asset stock and the results confirm that uncertainties affect the inspection efficiency negatively. Results also show that errors leading to the overestimation of the deterioration have less negative impact. The study suggests that data from a small number of influential segments is adequate to inform the prediction model.
引用
下载
收藏
页码:117 / 126
页数:10
相关论文
共 50 条
  • [21] Defect-Level Condition Assessment of Sewer Pipes
    Tizmaghz, Zahra
    Van Zyl, Jakobus E.
    Henning, Theuns F. P.
    Donald, Nathan
    Pancholy, Purvi
    Journal of Water Resources Planning and Management, 2025, 151 (03)
  • [22] The influence of condition assessment uncertainties on sewer deterioration modelling
    Caradot, Nicolas
    Riechel, Mathias
    Rouault, Pascale
    Caradot, Antoine
    Lengemann, Nic
    Eckert, Elke
    Ringe, Alexander
    Clemens, Francois
    Cherqui, Frederic
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2020, 16 (02) : 287 - 296
  • [23] Innovative sewer inspection as a basis for an optimised condition-based maintenance strategy
    Plihal, H.
    Kretschmer, F.
    Schwarz, D.
    Ertl, Th.
    WATER PRACTICE AND TECHNOLOGY, 2014, 9 (01): : 88 - 94
  • [24] THE NEGATIVE IMPACT OF THE TECHNICAL CONDITION OF SEWER INFILTRATION OF GROUNDWATER
    Molnarova, Lenka
    Stanko, Stefan
    Skultetyova, Ivona
    Holubec, Michal
    Galbova, Kristina
    WATER RESOURCES, FOREST, MARINE AND OCEAN ECOSYSTEMS, SGEM 2015, VOL I, 2015, : 677 - 682
  • [25] Pardee Tunnel Inspection and Condition Assessment
    Moughamian, Raffi
    McLeod, Marshall
    PIPELINES 2019: CONDITION ASSESSMENT, CONSTRUCTION, AND REHABILITATION, 2019, : 279 - 286
  • [26] Bridge inspection and condition assessment in Europe
    Helmerich, Rosemarie
    Niederleithinger, Ernst
    Algernon, Daniel
    Streicher, Doreen
    Wiggenhauser, Herbert
    TRANSPORTATION RESEARCH RECORD, 2008, (2044) : 31 - 38
  • [27] Risk assessment of sewer condition using artificial intelligence tools: application to the SANEST sewer system
    Sousa, V.
    Matos, J. P.
    Almeida, N.
    Matos, J. Saldanha
    WATER SCIENCE AND TECHNOLOGY, 2014, 69 (03) : 622 - 627
  • [28] Evaluation of artificial intelligence tool performance and uncertainty for predicting sewer structural condition
    Sousa, Vitor
    Matos, Jose P.
    Matias, Natercia
    AUTOMATION IN CONSTRUCTION, 2014, 44 : 84 - 91
  • [29] Defect Based Risk Assessment Model for Prioritizing Inspection of Sewer Pipelines
    Elmasry, M.
    Hawari, A.
    Zayed, T.
    PIPELINES 2018: CONDITION ASSESSMENT, CONSTRUCTION, AND REHABILITATION, 2018, : 1 - 9
  • [30] Risk assessment of persistent pharmaceuticals in biosolids: Dealing with uncertainty
    Garcia-Santiago, Xela
    Franco-Uria, Amaya
    Omil, Francisco
    Lema, Juan M.
    JOURNAL OF HAZARDOUS MATERIALS, 2016, 302 : 72 - 81