Vibration problem solution of high-capacity hydropower units

被引:1
|
作者
Khalyasmaa, A. I. [1 ]
Sultonov, S. M. [2 ]
Ahyoev, J. S. [2 ]
Bahovadinov, A. H. [3 ]
机构
[1] Ural Fed Univ, Ekaterinburg, Russia
[2] Tajik Tech Univ, Dept Power Stat, Dushanbe, Tajikistan
[3] Sangtuda 2 HPP, Engn & Maintenance Dept, Dushanbe, Tajikistan
关键词
D O I
10.1088/1757-899X/836/1/012009
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper proposes hydro generator vibration observations under various conditions and solution of a problem of high vibration in upper guide bearing of 110MW hydro generator. Among the test, which were carried out to identify vibration origin of hydro generating unit were: voltage drop tests, magnetic flux measurements, interferric gap measurements, turbine pressure pulsation measurements, etc. It was shown, that among other possible reasons, correct balancing, including pivot bearing adjustment was the most efficient measure to eliminate vibration in start-up modes of hydro power unit. According to the results of conducted step-by-step defect analysis, the corresponding recommendations were provided for service and maintenance regarding the generation unit No2 of Sangtuda-2 Hydro Power Plant, Tajikistan.
引用
收藏
页数:5
相关论文
共 50 条
  • [21] Economic Efficiency of Steam Boilers of High-Capacity Power Units.
    Dobrokhotov, V.I.
    Roddatis, K.F.
    Teploenergetika, 1979, (03): : 2 - 6
  • [22] DEMANDS MADE ON STEAM-GENERATORS FOR HIGH-CAPACITY GENERATING UNITS
    TYURIN, PY
    THERMAL ENGINEERING, 1975, 22 (09) : 12 - 15
  • [23] RELIABILITY OF PIPES MADE OF BOILER STEELS IN HIGH-CAPACITY GENERATING UNITS
    LANSKAYA, KA
    DOLINSKA.LA
    THERMAL ENGINEERING, 1973, 20 (10) : 6 - 11
  • [24] Oxide-nickel electrodes as hydrogen storage units of high-capacity
    Galushkin, N. E.
    Yazvinskaya, N. N.
    Galushkin, D. N.
    Galushkina, I. A.
    INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2014, 39 (33) : 18962 - 18965
  • [25] ACOUSTICALLY INDUCED PIPING VIBRATION IN HIGH-CAPACITY PRESSURE REDUCING SYSTEMS
    CARUCCI, VA
    MUELLER, RT
    MECHANICAL ENGINEERING, 1983, 105 (03) : 87 - 87
  • [26] Problem of Slagging in High-Capacity Power Plant Boilers.
    Dik, E.P.
    Dobrokhotov, V.I.
    Zalkind, I.Ya.
    Teploenergetika, 1980, (03): : 18 - 22
  • [27] High-Capacity Silicon-Air Battery in Alkaline Solution
    Zhong, Xing
    Zhang, Hua
    Liu, Yuan
    Bai, Jingwei
    Liao, Lei
    Huang, Yu
    Duan, Xiangfeng
    CHEMSUSCHEM, 2012, 5 (01) : 177 - 180
  • [28] INVESTIGATIONS OF HIGH-PRESSURE FEED WATER SYSTEMS WITH HIGH-CAPACITY PLANT UNITS
    CZINKOCZKY, B
    TOLNAI, L
    ENERGIA ES ATOMTECHNIKA, 1975, 28 (09): : 409 - 411
  • [29] Cost-Effective Solution for High-Capacity Unrepeatered Transmission
    Sutili, Tiago
    Neto, Pedro F. P.
    Simoes, Fabio D.
    Suzigan, Gabriel J.
    Figueiredo, Rafael C.
    2020 OPTICAL FIBER COMMUNICATIONS CONFERENCE AND EXPOSITION (OFC), 2020,
  • [30] A fast and high-capacity electromagnetic solution for high-speed IC design
    Gan, Houle
    Jiao, Dan
    IEEE/ACM INTERNATIONAL CONFERENCE ON COMPUTER-AIDED DESIGN DIGEST OF TECHNICAL PAPERS, VOLS 1 AND 2, 2007, : 1 - 6