共 50 条
- [41] A CASE STUDY FOR SIMULATION AND OPTIMIZATION BASED PLANNING OF PRODUCTION AND LOGISTICS SYSTEMS [J]. 2017 WINTER SIMULATION CONFERENCE (WSC), 2017, : 3495 - 3506
- [43] Integrated optimization for production planning and scheduling in a two-stage production system [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (04): : 796 - 806
- [45] Profit Optimization Through the Application of Theory of Constraints (TOC): A Case Study in Printing Company [J]. INTERNATIONAL CONFERENCE ON RECENT ADVANCES IN INDUSTRIAL ENGINEERING AND MANUFACTURING, 2019, 530
- [50] PRODUCTION PLANNING AND SCHEDULING [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 1995, 6 (02) : R1 - R2