Combined planning and scheduling in a divergent production system with co-production: A case study in the lumber industry

被引:29
|
作者
Gaudreault, Jonathan [1 ]
Frayret, Jean-Marc [1 ]
Rousseau, Alain [1 ]
D'Amours, Sophie [1 ]
机构
[1] Univ Laval, FORAC Res Consortium, Quebec City, PQ G1K 7P4, Canada
关键词
Integrated planning and scheduling; Mathematical programming; Constraint programming; Wood drying and finishing; Anytime algorithm; Lumber industry; EVOLUTIONARY ALGORITHM; INTEGRATION;
D O I
10.1016/j.cor.2010.10.013
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Many research initiatives carried out in production management consider process planning and operations scheduling as two separate and sequential functions. However, in certain contexts, the two functions must be better integrated. This is the case in divergent production systems with co-production (i.e. production of different products at the same time from a single product input) when alternative production processes are available. This paper studies such a context and focuses on the case of drying and finishing operations in a softwood lumber facility. The situation is addressed using a single model that simultaneously performs process planning and scheduling. We evaluate two alternative formulations. The first one is based on mixed integer programming (MIP) and the second on constraint programming (CP). We also propose a search procedure to improve the performance of the CP approach. Both approaches are compared with respect to their capacity to generate good solutions in short computation time. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1238 / 1250
页数:13
相关论文
共 50 条
  • [1] A case for co-production
    Vikram, Anvita
    Siniscalchi, Madeleine
    Banerji, Anita
    [J]. PSYCHOLOGIST, 2022, 35 : 4 - 4
  • [2] Evaluating order acceptance policies for divergent production systems with co-production
    Dumetz, Ludwig
    Gaudreault, Jonathan
    Thomas, Andre
    Lehoux, Nadia
    Marier, Philippe
    El-Haouzi, Hind
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (13) : 3631 - 3643
  • [3] Co-production and collaboration in planning - The difference
    Watson, Vanessa
    [J]. PLANNING THEORY & PRACTICE, 2014, 15 (01) : 62 - 76
  • [4] Planning with urban informality: a case for inclusion, co-production and reiteration
    Song, Lily K.
    [J]. INTERNATIONAL DEVELOPMENT PLANNING REVIEW, 2016, 38 (04) : 359 - 381
  • [5] Concurrent Planning and Scheduling of Heterogeneous Production System. Case Study
    Skolud, Bozena
    Szopa, Agnieszka
    Kalinowski, Krzysztof
    [J]. 14TH INTERNATIONAL CONFERENCE ON SOFT COMPUTING MODELS IN INDUSTRIAL AND ENVIRONMENTAL APPLICATIONS (SOCO 2019), 2020, 950 : 366 - 375
  • [6] Economic lot scheduling with uncontrolled co-production
    Oener, Selma
    Bilgic, Taner
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 188 (03) : 793 - 810
  • [7] Production planning, scheduling and control in industry
    Nogueira, Nelrian de Brito
    Roberto, Jose Carlos Alves
    Souto, Sistina Pereira
    de Lima, Orlem Pinheiro
    de Araujo, Paulo Cesar Diniz
    [J]. REVISTA DE GESTAO E SECRETARIADO-GESEC, 2023, 14 (06): : 8647 - 8670
  • [8] A computer vision system for lumber production planning
    Bhandarkar, SM
    Faust, TD
    Tang, MJ
    [J]. FOURTH IEEE WORKSHOP ON APPLICATIONS OF COMPUTER VISION - WACV'98, PROCEEDINGS, 1998, : 134 - 139
  • [9] Defining Co-Production: A Review of the Planning Literature
    Lee, Dahae
    Feiertag, Patricia
    Unger, Lena
    [J]. JOURNAL OF PLANNING LITERATURE, 2024, 39 (02) : 227 - 240
  • [10] PRE-VISIT PLANNING AND CO-PRODUCTION
    Varghese, P. A.
    Sharma, P.
    Sathe, M. N.
    Scott, A.
    [J]. PEDIATRIC PULMONOLOGY, 2018, 53 : 369 - 369