共 50 条
- [41] Seasonal Changes in the Parameters of the Normal Modes of the Chirkey Hydroelectric Power Plant Dam According to the Standing Waves Method [J]. Power Technology and Engineering, 2020, 53 (06): : 681 - 686
- [42] States of dam and base of Sayano-Shushenskaya hydroelectric power plant (HPP) and possible actions for the support of its reliability [J]. Gidrotekhnicheskoe Stroitel'stvo, 1994, (02): : 34 - 49
- [43] Experimental Investigation of the Anti-Vortex Devices of Beyhan 1 Dam and Hydroelectric Power Plant Water Intake Structure [J]. WORLD MULTIDISCIPLINARY CIVIL ENGINEERING-ARCHITECTURE-URBAN PLANNING SYMPOSIUM 2016, WMCAUS 2016, 2016, 161 : 881 - 886
- [46] Features of Sayano-Shushenskaya hydroelectric power plant dam behaviour at the filling of water storage basin up to the projected level [J]. Gidrotekhnicheskoe Stroitel'stvo, 1994, (04): : 21 - 25
- [47] Determining the natural frequencies of the dam at the Sayano-Shushenskaya hydroelectric power plant based on data from a seismometer system and computations [J]. Power Technology and Engineering, 1600, Springer Science and Business Media, LLC (50): : 506 - 510
- [48] Buffer Sizing Model Incorporating Fuzzy Risk Assessment: Case Study on Concrete Gravity Dam and Hydroelectric Power Plant Projects [J]. ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2018, 4 (01):