Quay crane scheduling in container terminals

被引:51
|
作者
Ng, W. C. [1 ]
Mak, K. L. [1 ]
机构
[1] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Hong Kong, Hong Kong, Peoples R China
关键词
quay crane scheduling; container terminal; heuristic;
D O I
10.1080/03052150600691038
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The problem of scheduling identical quay cranes moving along a common linear rail to handle containers for a ship is studied. The ship has a number of container-stacking compartments called bays, and only one quay crane can work on a bay at the same time. The objective of the scheduling problem is to find the work schedule for each quay crane which minimizes the ships stay time in port. Finding the optimal solution of the scheduling problem is computationally intractable and a heuristic is proposed to solve it. The heuristic first decomposes the difficult multi-crane scheduling problem into easier subproblems by partitioning the ship into a set of non-overlapping zones. The resulting subproblems for each possible partition are solved optimally by a simple rule. An effective algorithm for finding tight lower bounds is developed by modifying and enhancing an effective lower-bounding procedure proposed in the literature. Computational experiments were carried out to evaluate the performance of the heuristic on a set of test problems randomly generated based on typical terminal operations data. The computational results show that the heuristic can indeed find effective solutions for the scheduling problem, with the heuristic solutions on average 4.8% above their lower bounds.
引用
收藏
页码:723 / 737
页数:15
相关论文
共 50 条
  • [31] A SPLIT TASK SOLUTION FOR QUAY CRANE SCHEDULING PROBLEM IN MID-SIZE CONTAINER TERMINALS
    Grubisic, Neven
    Dundovic, Cedomir
    Zuskin, Srdjan
    [J]. TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2016, 23 (06): : 1723 - 1730
  • [32] A robust multiobjective model for the integrated berth and quay crane scheduling problem at seaside container terminals
    Nourmohammadzadeh, Abtin
    Voss, Stefan
    [J]. ANNALS OF MATHEMATICS AND ARTIFICIAL INTELLIGENCE, 2022, 90 (7-9) : 831 - 853
  • [33] Quay Crane assignment optimization with time window at container terminals
    Yang, Xinzhu
    Li, Yinzhen
    [J]. Journal of Information and Computational Science, 2015, 12 (02): : 761 - 774
  • [34] Berth and quay crane allocation and scheduling with worker performance variability and yard truck deployment in container terminals
    Chargui, Kaoutar
    Zouadi, Tarik
    El Fallahi, Abdellah
    Reghioui, Mohamed
    Aouam, Tarik
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2021, 154
  • [35] An efficient heuristic algorithm for solving a multi-vessel quay crane scheduling problem in container terminals
    Ding, Yi
    Chen, Xiazhong
    Chen, Kaimin
    [J]. INTERNATIONAL JOURNAL OF SHIPPING AND TRANSPORT LOGISTICS, 2023, 16 (3-4) : 454 - 477
  • [36] A flexible crane scheduling methodology for container terminals
    Dik, Guvenc
    Kozan, Erhan
    [J]. FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2017, 29 (01) : 64 - 96
  • [37] A flexible crane scheduling methodology for container terminals
    Guvenc Dik
    Erhan Kozan
    [J]. Flexible Services and Manufacturing Journal, 2017, 29 : 64 - 96
  • [38] A crane scheduling method for port container terminals
    Kim, KH
    Park, YM
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 156 (03) : 752 - 768
  • [39] Yard crane scheduling in port container terminals
    Ng, WC
    Mak, KL
    [J]. APPLIED MATHEMATICAL MODELLING, 2005, 29 (03) : 263 - 276
  • [40] An Online Model of Berth and Quay Crane Integrated Allocation in Container Terminals
    Zheng, Feifeng
    Qiao, Longliang
    Liu, Ming
    [J]. COMBINATORIAL OPTIMIZATION AND APPLICATIONS, (COCOA 2015), 2015, 9486 : 721 - 730