THE OPTIMIZATION OF MACHINING PARAMETERS IN MULTI-OBJECTIVE JOB-SHOP JUST-IN-TIME SCHEDULING

被引:0
|
作者
Wang, Shuai [1 ]
Jiang, Renhao [1 ]
Zhao, Na [1 ]
Sun, Yuting [1 ]
机构
[1] Shandong Acad Sci, Inst Oceanog Instrumentat, Shandong Prov Key Lab Ocean Environm Monitoring T, Qingdao 266001, Peoples R China
关键词
Machining parameter; Job-shop just-in-time scheduling; Evaluation function; Genetic algorithm;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
A multi-objective job-shop just-in-time scheduling model is built with new evaluation function to deal with the optimization of machining parameters in multi-objective Job-shop just-in-time scheduling. Computational result with genetic algorithm realized by computer shows that selecting machining parameters and scheduling simultaneity is better than traditional fashion which divided them into two steps. Moreover, the new evaluation function can reflect the effect of change of weight numbers to scheduling result well
引用
收藏
页码:631 / 635
页数:5
相关论文
共 50 条
  • [41] Simulation Optimization of Multi-objective Flexible Job Shop Scheduling
    Wang Guicong
    Li Chuanpeng
    Cui Huanyong
    MACHINE DESIGN AND MANUFACTURING ENGINEERING II, PTS 1 AND 2, 2013, 365-366 : 602 - 605
  • [42] A Multi-swarm Approach to Multi-objective Flexible Job-shop Scheduling Problems
    Liu, Hongbo
    Abraham, Ajith
    Wang, Zuwen
    FUNDAMENTA INFORMATICAE, 2009, 95 (04) : 465 - 489
  • [43] An Improved Genetic Algorithm for Multi-objective Flexible Job-shop Scheduling Problem
    Zhang, Chaoyong
    Wang, Xiaojuan
    Gao, Liang
    MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-5, 2010, 97-101 : 2449 - 2454
  • [44] Improved NSGA-II for the job-shop multi-objective scheduling problem
    Jiang X.
    Li Y.
    International Journal of Performability Engineering, 2018, 14 (05) : 891 - 898
  • [45] An estimation of distribution algorithm for the multi-objective flexible job-shop scheduling problem
    Wang, Shengyao
    Wang, Ling
    Liu, Min
    Xu, Ye
    PROCEEDINGS OF THE 2013 IEEE SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN SCHEDULING (CISCHED), 2013, : 1 - 8
  • [46] Optimising the job-shop scheduling problem using a multi-objective Jaya algorithm
    He, Lijun
    Li, Wenfeng
    Chiong, Raymond
    Abedi, Mehdi
    Cao, Yulian
    Zhang, Yu
    APPLIED SOFT COMPUTING, 2021, 111
  • [47] Immune Genetic Algorithm for Multi-objective Flexible Job-shop Scheduling Problem
    Ren, Huizhi
    Xu, Han
    Sun, Shenshen
    PROCEEDINGS OF THE 28TH CHINESE CONTROL AND DECISION CONFERENCE (2016 CCDC), 2016, : 2167 - 2171
  • [48] Multi-objective flexible Job-shop scheduling problem in steel tubes production
    Li, Lin
    Huo, Jia-Zhen
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2009, 29 (08): : 117 - 126
  • [49] A multi-objective genetic algorithm for fuzzy flexible job-shop scheduling problem
    Wang, Xiaojuan
    Gao, Liang
    Zhang, Chaoyong
    Li, Xinyu
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2012, 45 (2-3) : 115 - 125
  • [50] An effective hybrid algorithm for multi-objective flexible job-shop scheduling problem
    Huang, Xiabao
    Guan, Zailin
    Yang, Lixi
    ADVANCES IN MECHANICAL ENGINEERING, 2018, 10 (09):