共 50 条
- [31] Evaluation Research on policy risk of BOT project in Expressway Based on Structural Equation [J]. REGIONAL DEVELOPMENT AND RISK MANAGEMENT IN THE WEST OF CHINA, 2012, : 165 - 171
- [32] Assessment of Urban Environment Carrying Capacity Based on Catastrophe Theory [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY, ENVIRONMENT AND CHEMICAL ENGINEERING, 2015, 23 : 481 - 485
- [33] Research on Software Project Risk Assessment Model based on Fuzzy Theory and Improved [J]. 2017 IEEE 2ND ADVANCED INFORMATION TECHNOLOGY, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IAEAC), 2017, : 2073 - 2077
- [35] Research on the Risk Assessment of Engineering Project Based on Grey Theory and Fuzzy Mathematics [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 10724 - +
- [36] Study on Fuzzy Catastrophe Risk Model Based on Fuzzy Theory [J]. INTERNATIONAL JOURNAL OF SECURITY AND ITS APPLICATIONS, 2015, 9 (08): : 317 - U474
- [37] Research of Risk Management on XY Expressway BOT Project [J]. INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND SOFTWARE ENGINEERING (AISE 2014), 2014, : 271 - 276
- [38] Traffic Risk Assessment Model for Expressway Maintenance Work Zones Based on Risk Index [J]. CICTP 2019: TRANSPORTATION IN CHINA-CONNECTING THE WORLD, 2019, : 787 - 798
- [39] Risk assessment of glacial lake outburst based on catastrophe progression assessment method [J]. Intl. J. Earth Sci. Eng, 5 (2326-2332):
- [40] BEHAVIOR OF ECONOMIC EQUILIBRIA - CATASTROPHE THEORY APPROACH [J]. BEHAVIORAL SCIENCE, 1978, 23 (05): : 375 - 382