The idea of planning method for exploitation works in the multi-plant hard coal mining enterprise

被引:0
|
作者
Brzychczy, Edyta [1 ]
机构
[1] Wydzial Gornictwa & Geoinzynierii AGH, Krakow, Poland
关键词
planning; exploitation works; CPRG method; hard coal mining;
D O I
暂无
中图分类号
P57 [矿物学];
学科分类号
070901 ;
摘要
One of the most important processes in every enterprise is the activity planning. Production plans and different solutions accepted in the activity plans have often strategic meaning for the enterprise's market position. In modern enterprise, considering common use of the information systems, the absence such kind of systems during the planning process is rather impossible. Similar situation occurs also in the hard coal mining enterprises, but it have to be take into consideration that: mining production of useful minerals, especially underground mining, is a specific process with characteristic environment conditions, output level is the result of properly planned and running mining works in the mining enterprise, with the mining production are connected some different kinds of risk and uncertainty, which should be consider during the production planning process, present requirements due to increasing reliability and efficiency of the equipment in mining enterprise, result in engaging of very expensive machinery, so one of the principal matter should be its proper use during the mining production process. In the presented article the idea of planning method for exploitation works in the multi-plant hard coal mining enterprise is described. Its results could provide the decision process due to equipping the future mining works (mainly exploitation works) and estimation of the future production and economic results for the mining enterprise. In the paper characteristic conditions of the mining works planning process were presented and results of research work in application of evolutionary algorithms in the described matter. In the paper main elements of the theory assumptions in evolved method are given as well as the idea scheme and the general algorithm of evolved method.
引用
收藏
页码:19 / 31
页数:13
相关论文
共 50 条
  • [31] COMPUTER-AIDED PRODUCTION PLANNING PROCESS IN THE HARD COAL MINING
    Koszowski, Zbigniew
    Horodecki, Jan
    MINING OF MINERAL DEPOSITS, 2008, 2 : 45 - 51
  • [32] A deterministic model for planning production quantities in a multi-plant, multi-warehouse environment with extensible capacities
    Jolayemi, JK
    Olorunniwo, FO
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 87 (02) : 99 - 113
  • [33] A DECISION SUPPORT SYSTEM FOR MULTI-PLANT ASSEMBLY SEQUENCE PLANNING USING A PSO APPROACH
    Tseng, Yuan-Jye
    Chen, Jian-Yu
    Huang, Feng-Yi
    ICEIS 2009 : PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS, VOL AIDSS, 2009, : 124 - 129
  • [34] Optimum multi-period, multi-plant, and multi-supplier production planning for multi-grade petrochemicals
    Mrad, Mehdi
    Alfares, Hesham K.
    International Journal of Industrial Engineering : Theory Applications and Practice, 2016, 23 (06): : 399 - 411
  • [35] Production and logistics planning considering circulation taxes in a multi-plant seed corn company
    Junqueira, Rogerio A. R.
    Morabito, Reinaldo
    COMPUTERS AND ELECTRONICS IN AGRICULTURE, 2012, 84 : 100 - 110
  • [36] An Agent-Based Model to Support Negotiation-Based Order Acceptance in a Multi-Plant Enterprise
    Mobini, Zahra
    Behdani, Behzad
    Lukszo, Zofia
    Weijnen, Margot
    2011 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2011, : 1014 - 1019
  • [37] Performance analysis of a multi-plant specialty chemical manufacturing enterprise using an agent-based model
    Behdani, Behzad
    Lukszo, Zofia
    Adhitya, Arief
    Srinivasan, Rajagopalan
    COMPUTERS & CHEMICAL ENGINEERING, 2010, 34 (05) : 793 - 801
  • [38] Dialogue method of three-dimensional problem solution of planning the mining works volumes of open coal mining and algorithm of its realization
    Inst Gornogo Dela SO RAN, Novosibirsk, Russia
    Fiz Tekh Probl Razrab Polezn Iskop, 6 (94-104):
  • [39] An order decision and production planning integrated available-to-promise model for multi-plant manufacturing
    Wang, Wen-Hao
    Zhang, Jie
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2011, 45 (12): : 1794 - 1799
  • [40] IMPACT OF THE FORMAL REQUIREMENTS AND GEOLOGICAL AND MINING CONDITIONS ON THE EXPLOITATION OF HARD COAL RESOURCES IN UPPER SILESIAN COAL BASIN (POLAND)
    Borowka, Borys
    SCIENCE AND TECHNOLOGIES IN GEOLOGY, EXPLORATION AND MINING, SGEM 2015, VOL I, 2015, : 247 - 252