The idea of planning method for exploitation works in the multi-plant hard coal mining enterprise

被引:0
|
作者
Brzychczy, Edyta [1 ]
机构
[1] Wydzial Gornictwa & Geoinzynierii AGH, Krakow, Poland
关键词
planning; exploitation works; CPRG method; hard coal mining;
D O I
暂无
中图分类号
P57 [矿物学];
学科分类号
070901 ;
摘要
One of the most important processes in every enterprise is the activity planning. Production plans and different solutions accepted in the activity plans have often strategic meaning for the enterprise's market position. In modern enterprise, considering common use of the information systems, the absence such kind of systems during the planning process is rather impossible. Similar situation occurs also in the hard coal mining enterprises, but it have to be take into consideration that: mining production of useful minerals, especially underground mining, is a specific process with characteristic environment conditions, output level is the result of properly planned and running mining works in the mining enterprise, with the mining production are connected some different kinds of risk and uncertainty, which should be consider during the production planning process, present requirements due to increasing reliability and efficiency of the equipment in mining enterprise, result in engaging of very expensive machinery, so one of the principal matter should be its proper use during the mining production process. In the presented article the idea of planning method for exploitation works in the multi-plant hard coal mining enterprise is described. Its results could provide the decision process due to equipping the future mining works (mainly exploitation works) and estimation of the future production and economic results for the mining enterprise. In the paper characteristic conditions of the mining works planning process were presented and results of research work in application of evolutionary algorithms in the described matter. In the paper main elements of the theory assumptions in evolved method are given as well as the idea scheme and the general algorithm of evolved method.
引用
收藏
页码:19 / 31
页数:13
相关论文
共 50 条
  • [21] A novel model for multi-plant mixed heavy crude oils refinery planning
    Xiaoqiao Huang
    Yangdong Hu
    Lijuan Song
    Yuzhen Zhang
    Dongkui Chen
    ChineseJournalofChemicalEngineering, 2017, 25 (02) : 202 - 210
  • [22] A novel model for multi-plant mixed heavy crude oils refinery planning
    Huang, Xiaoqiao
    Hu, Yangdong
    Song, Lijuan
    Zhang, Yuzhen
    Chen, Dongkui
    CHINESE JOURNAL OF CHEMICAL ENGINEERING, 2017, 25 (02) : 202 - 210
  • [23] Optimized production planning model for a multi-plant cultivation system under uncertainty
    Ke, Shunkui
    Guo, Doudou
    Niu, Qingliang
    Huang, Danfeng
    ENGINEERING OPTIMIZATION, 2015, 47 (02) : 204 - 220
  • [24] Production Planning Optimization of Coal Mining Enterprise under Different Market
    Liu Haibin
    Liu Zhenling
    Huang Hui
    ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 820 - 823
  • [25] The influence of concentrate's quality on the economic efficiency of multi-plant mining and metallurgical company
    Skorupska, Bozena
    Saramak, Daniel
    Tumidajski, Tadeusz
    Wieniewski, Andrzej
    GOSPODARKA SUROWCAMI MINERALNYMI-MINERAL RESOURCES MANAGEMENT, 2007, 23 (04): : 39 - 51
  • [26] Improving the Management of a Mining Enterprise a Condition for Increasing the Efficiency of Hard Coal Production
    Prusek, Stanislaw
    Turek, Marian
    INZYNIERIA MINERALNA-JOURNAL OF THE POLISH MINERAL ENGINEERING SOCIETY, 2018, (02): : 73 - 80
  • [27] A particle swarm optimisation algorithm for multi-plant assembly sequence planning with integrated assembly sequence planning and plant assignment
    Tseng, Yuan-Jye
    Chen, Jian-Yu
    Huang, Feng-Yi
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (10) : 2765 - 2791
  • [28] Market risk in the hard coal mining industry in Poland in the context of the mining production planning
    Jonek-Kowalska, Izabela
    PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON ECONOMIC AND BUSINESS MANAGEMENT (FEBM 2017), 2017, 33 : 770 - 776
  • [29] Mining exploitation forecasted effects caused by a hard coal extraction from a thick seam
    Orwat, J.
    INTERNATIONAL CONFERENCE ON APPLIED SCIENCES, 2020, 1426
  • [30] OPTIMUM MULTI-PERIOD, MULTI-PLANT, AND MULTI-SUPPLIER PRODUCTION PLANNING FOR MULTI-GRADE PETROCHEMICALS
    Mrad, Mehdi
    Alfares, Hesham K.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2016, 23 (06): : 399 - 411