Research of Production Scheduling Algorithm based on Bottleneck Analysis

被引:1
|
作者
He Wei [1 ]
Cheng Rongqiu [2 ]
机构
[1] Univ Elect Sci & Technol China, Sch Management & Econ, Chengdu 610054, Sichuan, Peoples R China
[2] Huazhong Univ Sci & Technol, Wuhan 430074, Peoples R China
关键词
D O I
10.1109/CCCM.2008.223
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Production scheduling is a familiar element in the manufacturing flow and the key point of scheduling is bottleneck. By analyzing the bottleneck in the manufacturing flow, the paper aims to build an illuminative production scheduling algorithm, which divides scheduling into two stages. At the first stage, the preliminary delivery time of the working bottleneck can be identified after being scheduled under the principles of EDD and SPT based on the time of delivery; at the second, after considering the indexes of time of delivery, processing batch, transport hours, man-hours, material varieties as well as material quality etc., a multi-target fuzzy clustering method is adopted in the scheduling of the sequences over bottleneck in order to acquire a better and feasible scheduling.
引用
收藏
页码:52 / +
页数:2
相关论文
共 50 条
  • [31] Research of Production Scheduling Based on Theory of Constraints
    Zhang, X. M.
    Du, Y. L.
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ELECTRICAL, AUTOMATION AND MECHANICAL ENGINEERING (EAME 2015), 2015, 13 : 142 - 145
  • [32] Research and Application of Bottleneck-based Planning and Scheduling Method for PCB Manufacturing System
    Luo, Dan
    Guan, Zailin
    He, Cong
    Fang, Weikang
    Wang, Chuangjian
    Zeng, Zhangyi
    2019 INTERNATIONAL CONFERENCE ON INTELLIGENT MANUFACTURING AND INTELLIGENT MATERIALS (2IM 2019), 2019, 565
  • [33] Research on Production Scheduling of Industrial Big Data for Internet of Things Based on Dynamic Planning Algorithm
    Zhang N.
    Applied Mathematics and Nonlinear Sciences, 2024, 9 (01)
  • [34] Bottleneck focused heuristic algorithm for flow shop scheduling problem
    School of Economics and Management, University of Science and Technology Beijing, Beijing 100083, China
    不详
    Jisuanji Jicheng Zhizao Xitong, 1600, 2 (356-363):
  • [35] Chlor-alkali industry production scheduling algorithm research based on adaptive weight PSO
    Gao, Shuzhi, 1600, Journal of Chemical and Pharmaceutical Research, 3/668 Malviya Nagar, Jaipur, Rajasthan, India (06):
  • [36] An improved shifting bottleneck algorithm for job shop scheduling problem
    Zhang, DF
    Li, TQ
    Li, SZ
    PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, VOLS 1 AND 2, 2005, : 1112 - 1116
  • [37] A hybrid shifting bottleneck algorithm for the job shop scheduling problem
    Zhao, Lianghui
    Deng, Feiqi
    DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES A-MATHEMATICAL ANALYSIS, 2006, 13 : 1069 - 1073
  • [38] Method of Improving Production Scheduling Based on the Genetic Algorithm
    Gao, Yong
    Li, Mingyu
    Wang, Jianping
    PRECISION ENGINEERING AND NON-TRADITIONAL MACHINING, 2012, 411 : 415 - +
  • [39] An Improved Production Scheduling Algorithm based on Resource Constraints
    Gao, Yan
    Zhang, Xin
    Xu, Jianzhong
    MECHANICAL MATERIALS AND MANUFACTURING ENGINEERING III, 2014, 455 : 619 - +
  • [40] Multi-reentrant manufacturing system scheduling based on layered bottleneck analysis
    Qiao, Fei
    Ma, Yu-Min
    Li, Li
    Ding, Xiao-Jin
    Dai, Ya-Nan
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (04): : 855 - 860