Research of Production Scheduling Algorithm based on Bottleneck Analysis

被引:1
|
作者
He Wei [1 ]
Cheng Rongqiu [2 ]
机构
[1] Univ Elect Sci & Technol China, Sch Management & Econ, Chengdu 610054, Sichuan, Peoples R China
[2] Huazhong Univ Sci & Technol, Wuhan 430074, Peoples R China
关键词
D O I
10.1109/CCCM.2008.223
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Production scheduling is a familiar element in the manufacturing flow and the key point of scheduling is bottleneck. By analyzing the bottleneck in the manufacturing flow, the paper aims to build an illuminative production scheduling algorithm, which divides scheduling into two stages. At the first stage, the preliminary delivery time of the working bottleneck can be identified after being scheduled under the principles of EDD and SPT based on the time of delivery; at the second, after considering the indexes of time of delivery, processing batch, transport hours, man-hours, material varieties as well as material quality etc., a multi-target fuzzy clustering method is adopted in the scheduling of the sequences over bottleneck in order to acquire a better and feasible scheduling.
引用
收藏
页码:52 / +
页数:2
相关论文
共 50 条
  • [11] Research on Knitted Production Line Scheduling Based on Improved Simulated Annealing Algorithm
    Du, Lizhen
    Wang, Yuhao
    Xuan, Zifeng
    Ye, Tao
    Zhang, Yajun
    Computer Engineering and Applications, 2023, 59 (09): : 304 - 312
  • [12] Research on the production scheduling of printing enterprises based on artificial bee colony algorithm
    Shen, Zhong-Jie
    Zhang, Yuan-Biao
    Qi, Han
    Wu, Qing-Long
    Xia, Yu-Hong
    Liu, Jia-Lin
    Advances in Information Sciences and Service Sciences, 2012, 4 (12): : 256 - 265
  • [13] A SCHEDULING MODEL OF CHINESE MEDICINE PRODUCTION BASED ON GENETIC ALGORITHM RESEARCH AND APPLICATIONS
    Guo, Jian-Yi
    Zhi, Hua
    Zhang, Yan-Mei
    Wang, Hai-Xiong
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-6, 2009, : 2050 - 2053
  • [14] Application research of improved genetic algorithm based on machine learning in production scheduling
    Guo, Kai
    Yang, Mei
    Zhu, Hai
    NEURAL COMPUTING & APPLICATIONS, 2020, 32 (07): : 1857 - 1868
  • [15] Research on Scheduling Algorithm of Knitting Production Workshop Based on Deep Reinforcement Learning
    Sun, Lei
    Shi, Weimin
    Xuan, Chang
    Zhang, Yongchao
    MACHINES, 2024, 12 (08)
  • [16] Application research of improved genetic algorithm based on machine learning in production scheduling
    Kai Guo
    Mei Yang
    Hai Zhu
    Neural Computing and Applications, 2020, 32 : 1857 - 1868
  • [17] Research on Production Scheduling Technology in Knitting Workshop Based on Improved Genetic Algorithm
    Sun, Lei
    Shi, Weimin
    Wang, Junru
    Mao, Huimin
    Tu, Jiajia
    Wang, Luojun
    APPLIED SCIENCES-BASEL, 2023, 13 (09):
  • [18] Scheduling a bottleneck facility for two production lines
    Chung-Yaw, Ching
    Ching-Jong, Liao
    Wu, C. JOhn
    Soviet Journal of Remote Sensing (English translation of Issledovanie Zemli iz Kosmosa), 1994, 11 (03):
  • [19] SCHEDULING A BOTTLENECK FACILITY FOR 2 PRODUCTION LINES
    CHING, CY
    LIAO, CJ
    WU, CJ
    ENGINEERING OPTIMIZATION, 1994, 23 (01) : 47 - 55
  • [20] An immune genetic algorithm based on bottleneck jobs for the job shop scheduling problem
    Zhang, Rui
    Wu, Cheng
    EVOLUTIONARY COMPUTATION IN COMBINATORIAL OPTIMIZATION, PROCEEDINGS, 2008, 4972 : 147 - 157