共 50 条
- [1] Research on Production Scheduling System with Bottleneck Based on Multi-agent INTERNATIONAL CONFERENCE ON APPLIED PHYSICS AND INDUSTRIAL ENGINEERING 2012, PT C, 2012, 24 : 1903 - 1909
- [2] Research on Production Scheduling System with Bottleneck Based on Multi-agent 2010 INTERNATIONAL COLLOQUIUM ON COMPUTING, COMMUNICATION, CONTROL, AND MANAGEMENT (CCCM2010), VOL II, 2010, : 432 - 435
- [4] A heuristics-based advanced planning and scheduling system with bottleneck scheduling algorithm 2006 IEEE CONFERENCE ON EMERGING TECHNOLOGIES & FACTORY AUTOMATION, VOLS 1 -3, 2006, : 682 - +
- [5] Research and Application of BP Algorithm Based on Genetic Algorithm in System Performance Bottleneck Analysis 2018 4TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND MATERIAL APPLICATION, 2019, 252
- [6] An algorithm based on taboo search and shifting bottleneck for job shop scheduling PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 560 - 564
- [8] Production scheduling problem based on multifactor dynamic analysis algorithm Academic Journal of Manufacturing Engineering, 2019, 17 (03): : 146 - 152
- [9] Algorithm based on taboo search and shifting bottleneck for job shop scheduling Journal of Computer Science and Technology, 2004, 19 : 776 - 781
- [10] Research on the Dynamic Scheduling Problem of Bottleneck in Emergency Based on Improved GA NINTH CHINA PROJECT MANAGEMENT CONFERENCE, 2010, : 215 - 218