共 50 条
- [2] A heuristic method for Earth Observing Satellites united imaging scheduling [J]. Yuhang Xuebao/Journal of Astronautics, 2009, 30 (02): : 652 - 658
- [3] Scheduling Scenarios for VLBI Observations of Satellites [J]. IAG 150 YEARS, 2016, 143 : 564 - 570
- [5] a Comparison of Heuristic Methods for Scheduling Earth Observing Satellites Fleet [J]. ITCS: 2009 INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND COMPUTER SCIENCE, PROCEEDINGS, VOL 2, PROCEEDINGS, 2009, : 164 - +
- [6] HEURISTIC ALGORITHM FOR PROJECT SCHEDULING WITH LIMITED RESOURCES. [J]. Journal of the Institution of Engineers (India): Mechanical Engineering Division, 1984, 65 : 6 - 9
- [7] Scheduling observations of agile satellites with combined genetic algorithm [J]. ICNC 2007: THIRD INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION, VOL 3, PROCEEDINGS, 2007, : 29 - +
- [8] Study on heuristic algorithm for dynamic scheduling problem of Earth Observing Satellites [J]. SNPD 2007: EIGHTH ACIS INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING, ARTIFICIAL INTELLIGENCE, NETWORKING, AND PARALLEL/DISTRIBUTED COMPUTING, VOL 1, PROCEEDINGS, 2007, : 9 - +
- [9] Solving the selecting and scheduling satellite photographs problem with a consistent neighborhood heuristic [J]. ICTAI 2004: 16TH IEEE INTERNATIONALCONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2004, : 302 - 309