共 50 条
- [1] OPTIMIZATION BASED HEURISTIC FOR SCHEDULING PARALLEL PROJECT NETWORKS WITH CONSTRAINED RENEWABLE RESOURCES. IIE Transactions (Institute of Industrial Engineers), 1988, 20 (02): : 137 - 143
- [8] EXTENSION OF THE ALGORITHM ″LEAST TIME TO GO″ IN SCHEDULING SEVERAL RESOURCES. Alta Frequenza, 1976, 45 (10): : 581 - 586
- [9] A Heuristic Algorithm for Project Scheduling with Fuzzy Parameters CENTERIS 2017 - INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS / PROJMAN 2017 - INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT / HCIST 2017 - INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, CENTERI, 2017, 121 : 63 - 71