ALTERNATE METHODS OF PROJECT SCHEDULING WITH LIMITED RESOURCES

被引:45
|
作者
PATTERSON, JH [1 ]
机构
[1] PENN STATE UNIV, COLL BUSINESS ADM, UNIVERSITY PK, PA USA
关键词
D O I
10.1002/nav.3800200415
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:767 / 784
页数:18
相关论文
共 50 条
  • [1] PROJECT SCHEDULING WITH LIMITED RESOURCES
    WIEST, JD
    [J]. OPERATIONS RESEARCH, 1965, S 13 : B155 - &
  • [2] Project scheduling with limited resources using a genetic algorithm
    Montoya-Torres, Jairo R.
    Gutierrez-Franco, Edgar
    Pirachican-Mayorga, Carolina
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (06) : 619 - 628
  • [3] A new formulation for the project scheduling problem under limited resources
    Bianco, Lucio
    Caramia, Massimiliano
    [J]. FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2013, 25 (1-2) : 6 - 24
  • [4] A new formulation for the project scheduling problem under limited resources
    Lucio Bianco
    Massimiliano Caramia
    [J]. Flexible Services and Manufacturing Journal, 2013, 25 : 6 - 24
  • [5] A framework for an interactive project scheduling system under limited resources
    Ulusoy, G
    Ozdamar, L
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) : 362 - 375
  • [6] Portfolio scheduling: an integrative approach of limited resources and project prioritization
    Villafanez, Felix
    Poza, David
    Lopez-Paredes, Adolfo
    Pajares, Javier
    Acebes, Fernando
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 103 - 116
  • [7] Stochastic network project scheduling with non-consumable limited resources
    GolenkoGinzburg, D
    Gonik, A
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 48 (01) : 29 - 37
  • [8] Project scheduling with limited resources using an efficient differential evolution algorithm
    Afshar-Nadjafi, Behrouz
    Karimi, Hamid
    Rahimi, Amir
    Khalili, Somayeh
    [J]. Journal of King Saud University - Engineering Sciences, 2015, 27 (02) : 176 - 184
  • [9] Time-cost optimization in repetitive project scheduling with limited resources
    Zou, Xin
    Zhang, Lihui
    Zhang, Qian
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (02) : 669 - 701
  • [10] Optimization method for highway project scheduling under limited resources condition
    Yao, Yu-Ling
    Wang, Bing-Gang
    [J]. Chang'an Daxue Xuebao (Ziran Kexue Ban)/Journal of Chang'an University (Natural Science Edition), 2007, 27 (03): : 42 - 46