HEURISTIC ALGORITHM FOR PROJECT SCHEDULING WITH LIMITED RESOURCES.

被引:0
|
作者
Jain, T.C. [1 ]
Hardas, A.M. [1 ]
机构
[1] Rajasthan State Electricity Board, Jaipur, India, Rajasthan State Electricity Board, Jaipur, India
关键词
PREDECESSOR PENALTY - PROJECT SCHEDULING - RESOURCE PENALTY - SLACK PENALTY;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:6 / 9
相关论文
共 50 条
  • [41] A heuristic scheduling algorithm for improving the duration and net present value of a project
    Ulusoy, G.
    Oezdamar, L.
    International Journal of Operations & Production Management, 15 (01):
  • [42] Heuristic Algorithm in Optimizing Stochastic Resource-Constrained Project Scheduling
    Guo, Fang Ming
    Ma, Li
    He, Min
    INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION, VOL 1, PROCEEDINGS, 2009, : 975 - +
  • [43] Heuristic-Tabu Algorithm for Hybrid Flowshop Scheduling with Limited Waiting Time
    Liu, Siyi
    Cui, Jianshuang
    Li, Yan
    PROCEEDINGS OF THE 2008 INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND DESIGN, VOL 2, 2008, : 233 - +
  • [44] Trauma care in Madagascar: Making use of limited resources.
    Hughes, DC
    Lyon, JL
    JOURNAL OF INVESTIGATIVE MEDICINE, 1999, 47 (02) : 90A - 90A
  • [45] Robust Project Scheduling with Unreliable Resources: A Variable Neighbourhood Search Based Heuristic Approach
    Chakrabortty, Ripon K.
    Abbasi, Alireza
    Ryan, Michael J.
    2018 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2018, : 656 - 660
  • [46] Critical Chain Project Management Based Heuristic Algorithm for Multiple Resources-Constrained Project
    Liu Jian-Bing
    Ren Hong
    Xie Ji-Hai
    ISBIM: 2008 INTERNATIONAL SEMINAR ON BUSINESS AND INFORMATION MANAGEMENT, VOL 1, 2009, : 330 - +
  • [47] The project scheduling problem with production and consumption of resources: A list-scheduling based algorithm
    Carlier, Jacques
    Moukrim, Aziz
    Xu, Huang
    DISCRETE APPLIED MATHEMATICS, 2009, 157 (17) : 3631 - 3642
  • [48] A heuristic search algorithm for solving resource-constrained project scheduling problems
    Ahsan, MK
    Tsao, DB
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2003, 20 (02) : 143 - 160
  • [49] A HEURISTIC ALGORITHM FOR GROUP SCHEDULING
    RADHARAMANAN, R
    COMPUTERS & INDUSTRIAL ENGINEERING, 1986, 11 (1-4) : 204 - 208
  • [50] HEURISTIC PROCEDURES FOR PROBABILISTIC PROJECT SCHEDULING
    Beraldi, Patrizia
    Bruni, Maria Elena
    Guerriero, Francesca
    Pinto, Erika
    EMSS 2008: 20TH EUROPEAN MODELING AND SIMULATION SYMPOSIUM, 2008, : 655 - 664