共 50 条
- [41] A heuristic scheduling algorithm for improving the duration and net present value of a project International Journal of Operations & Production Management, 15 (01):
- [42] Heuristic Algorithm in Optimizing Stochastic Resource-Constrained Project Scheduling INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION, VOL 1, PROCEEDINGS, 2009, : 975 - +
- [43] Heuristic-Tabu Algorithm for Hybrid Flowshop Scheduling with Limited Waiting Time PROCEEDINGS OF THE 2008 INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND DESIGN, VOL 2, 2008, : 233 - +
- [45] Robust Project Scheduling with Unreliable Resources: A Variable Neighbourhood Search Based Heuristic Approach 2018 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2018, : 656 - 660
- [46] Critical Chain Project Management Based Heuristic Algorithm for Multiple Resources-Constrained Project ISBIM: 2008 INTERNATIONAL SEMINAR ON BUSINESS AND INFORMATION MANAGEMENT, VOL 1, 2009, : 330 - +
- [50] HEURISTIC PROCEDURES FOR PROBABILISTIC PROJECT SCHEDULING EMSS 2008: 20TH EUROPEAN MODELING AND SIMULATION SYMPOSIUM, 2008, : 655 - 664