A Heuristic Method for Selecting and Scheduling Observations of Satellites with Limited Agility

被引:6
|
作者
Wang, Pei [1 ]
Tan, Yuejin [1 ]
机构
[1] Natl Univ Def Technol, Sch Informat Syst & Management, Changsha, Hunan, Peoples R China
关键词
Automation; Scheduling; Earth Observing Satellite; agility;
D O I
10.1109/WCICA.2008.4594541
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
As a new application area of Automation, Earth Observing Satellite Imaging provides timely optical/radar information which is used for commercial, environmental and military applications. As the satellite passes over the Earth, onboard camera imaging parameters need to be specified to focus and capture data within request zones. The satellite scheduling problem arises when there are competing client requests and limited agility of the satellite: we want to automatically choose the satellite imaging parameters that will maximize the coverage and value of the requested images. In this paper, we propose a heuristic algorithm for selecting and scheduling observations of satellites with limited agility, as well as a solution for an implicit clustering subproblem of capturing images in clusters of contiguous requested regions. The algorithm has been tested on different satellites configurations in order to prove its efficiency and to guide the development of satellite performances.
引用
收藏
页码:5292 / 5297
页数:6
相关论文
共 50 条
  • [21] HEURISTIC METHOD FOR OPTIMUM SHIFT SCHEDULING DESIGN
    Weng, Lee Kong
    Nah, Sze San
    Keong, Phang Keat
    PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON COMPUTING AND INFORMATICS: EMBRACING ECO-FRIENDLY COMPUTING, 2017, : 112 - 118
  • [22] Heuristic method for solving PDP scheduling problem
    Lu, Rui
    Wang, Cheng-En
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2009, 30 (05): : 628 - 631
  • [23] Flow shop scheduling problem with limited machine availability: A heuristic approach
    Aggoune, R
    Portmann, MC
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 99 (1-2) : 4 - 15
  • [24] Constructive Backtracking Heuristic for Hybrid Flowshop Scheduling with Limited Waiting Times
    Li, Tieke
    Li, Yan
    2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 6671 - 6674
  • [25] Heuristic Difference Algorithm for Scheduling Flowshop with Limited Storage in Chemical Industry
    Tang, Qi
    Lin, Guozhi
    PROCEEDINGS OF 2016 9TH INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND DESIGN (ISCID), VOL 2, 2016, : 13 - 16
  • [26] A HEURISTIC FOR MULTI-PROJECT SCHEDULING WITH LIMITED RESOURCES IN THE HOUSING INDUSTRY
    TSUBAKITANI, S
    DECKRO, RF
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) : 80 - 91
  • [27] Exact and Heuristic Scheduling Algorithms for Multiple Earth Observation Satellites Under Uncertainties of Clouds
    Wang, Jianjiang
    Demeulemeester, Erik
    Hu, Xuejun
    Qiu, Dishan
    Liu, Jin
    IEEE SYSTEMS JOURNAL, 2019, 13 (03): : 3556 - 3567
  • [28] Fixed Interval Scheduling of Multiple Earth Observation Satellites with Multiple Observations
    Wang, Xinwei
    Leus, Roel
    Han, Chao
    PROCEEDINGS OF 2018 9TH INTERNATIONAL CONFERENCE ON MECHANICAL AND AEROSPACE ENGINEERING (ICMAE 2018), 2018, : 28 - 33
  • [29] A heuristic method for selecting support features from large datasets
    Ryoo, Hong Seo
    Jang, In-Yong
    ALGORITHMIC ASPECTS IN INFORMATION AND MANAGEMENT, PROCEEDINGS, 2007, 4508 : 411 - +
  • [30] A robust scheduling method of electronic reconnaissance satellites with uncertainty
    Huang, Xiaojun
    Ma, Manhao
    Huang, Wei
    Li, Jianjun
    Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2010, 38 (11): : 80 - 83