共 50 条
- [33] Unloading deformation during layered excavation for the underground powerhouse of Jinping I Hydropower Station, southwest China Bulletin of Engineering Geology and the Environment, 2010, 69 : 343 - 351
- [34] Deformation mechanism analysis of surrounding rock at arch crown in underground powerhouse Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2013, 32 (SUPPL.2): : 3520 - 3526
- [36] Mesoscopic deformation and fracture of marble at underground powerhouse of Jinping I hydropower station Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2014, 33 (11): : 2179 - 2189
- [37] Microseismic characteristics analysis of fault activation induced by excavation unloading at the left bank underground powerhouse of the Baihetan hydropower station, China ROCK DYNAMICS: FROM RESEARCH TO ENGINEERING, 2016, : 417 - 422
- [38] Control and monitoring of rock mass engineering of super large underground powerhouse cavern groups at Xiluodu hydropower station Li, J. (li_jinhe@ctgpc.com.cn), 1600, Academia Sinica (32):
- [39] Study of deformation and cracking mechanism of surrounding rock of Jinping I underground powerhouse Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2010, 29 (12): : 2429 - 2441
- [40] Research on the Bearing Capacity for Rock Bolt Crane Girder in the Underground Powerhouse of Large Hydropower Station ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 3563 - +