Microseismic early warning of surrounding rock mass deformation in the underground powerhouse of the Houziyan hydropower station, China

被引:70
|
作者
Dai, Feng [1 ]
Li, Biao [1 ]
Xu, Nuwen [1 ]
Zhu, Yongguo [2 ]
机构
[1] Sichuan Univ, Coll Water Resource & Hydropower, State Key Lab Hydraul & Mt River Engn, Chengdu 610065, Sichuan Provinc, Peoples R China
[2] China Guodian Dadu River Houziyan Hydropower Dev, Kangding 610041, Sichuan Provinc, Peoples R China
基金
中国国家自然科学基金;
关键词
Underground powerhouse; Microseismic monitoring; Deformation; Early warning; Houziyan hydropower station; SPATIAL VARIATION; STABILITY; CAVERNS; STRESS;
D O I
10.1016/j.tust.2016.11.009
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Early warning of surrounding rock mass deformation and failure is of great significance for an underground powerhouse and remains a challenge in rock engineering. The microseismic (MS) monitoring technique was adopted for surrounding rock mass deformation forecasting in the underground powerhouse of the Houziyan hydropower station. By analysing the evolution laws of multiple MS parameters, including the MS event count, the energy release, the energy index, the apparent volume, the dominant frequency, the b value, and the fractal dimension, typical abnormal variations prior to a large deformation were obtained, and these MS parameters were found to behave differently. The MS event count appeared with escalating fluctuation as the energy demonstrated a gradually accelerating increase, while the energy index sharply increased with a stable increase of the cumulative apparent volume. Moreover, the dominant frequency, the b value, and the fractal dimension decreased. Accordingly, these MS abnormalities can be regarded as indicators prior to a large deformation of surrounding rock mass. A comprehensive analysis of these MS parameters could allow for better warning and risk assessment of surrounding rock mass deformation and failure in underground caverns. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:64 / 74
页数:11
相关论文
共 50 条
  • [21] Deformation and failure analyses of large underground caverns during construction of the Houziyan Hydropower Station, Southwest China
    Li, Hai-bo
    Yang, Xing-guo
    Zhang, Xue-bin
    Zhou, Jia-wen
    ENGINEERING FAILURE ANALYSIS, 2017, 80 : 164 - 185
  • [23] Key rock mechanical problems of underground powerhouse in Shuibuya hydropower station
    Wu, Aiqing
    Yang, Qigui
    Ding, Xiuli
    Zhou, Huoming
    Lu, Bo
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2011, 3 (01) : 64 - 72
  • [24] Engineering rock mechanics practices in the underground powerhouse at Jinping Ⅰ hydropower station
    Aiqing Wu
    Jimin Wang
    Zhong Zhou
    Shuling Huang
    Xiuli Ding
    Zhihong Dong
    Yuting Zhang
    Journal of Rock Mechanics and Geotechnical Engineering, 2016, 8 (05) : 640 - 650
  • [25] Failure mechanism and mode of surrounding rock of underground powerhouse at the right bank of Wudongde hydropower station subjected to excavation
    Li A.
    Dai F.
    Xu N.
    Gu G.
    Liu K.
    Li B.
    Xu, Nuwen (xunuwen@scu.edu.cn), 2017, Academia Sinica (36): : 781 - 793
  • [26] Comprehensive analysis of the surrounding rock mass stability in the underground caverns of Jinping I hydropower station in Southwest China
    Ma, Ke
    Zhang, Jianhai
    Zhou, Zhong
    Xu, Nuwen
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2020, 104 (104)
  • [28] Stability analysis of surrounding rock of underground openings of a hydropower station
    Research Center of Geotechnical and Structural Engineering, Shandong University, Jinan 250061, China
    Rock Soil Mech, 2006, SUPPL. (416-420):
  • [29] Stability analysis of surrounding rock of underground openings of a hydropower station
    Yu, Wei-Ping
    Geng, Ke-Qin
    Wang, Xiao-Gang
    Yantu Lixue/Rock and Soil Mechanics, 2004, 25 (12): : 1955 - 1960
  • [30] Stability Analysis of Surrounding Rock Mass of Underground Powerhouse Cavern
    He, Xiaogang
    Dai, Feng
    Xu, Nuwen
    Sha, Chun
    CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 878 - +