Open caisson-sinking techniques permit a shaft structure to be progressively sunk, either under its own weight or with the aid of caisson jacks, in a controlled manner from the surface to a predetermined depth. The technique is suited to shaft construction through weak soils, high-to extremely high-plasticity clays, silts, and sands and gravels, particularly below the water table. In the tunnelling and public works engineering sectors, open caissons are typically circular in cross-section; those used in harbour works are commonly square or rectangular in plan. The paper briefly describes the components and method of sinking dry and wet open caissons, highlighting good practice. It then examines in detail four recent, highly successful caisson-sinking operations carried out under a framework agreement for Scottish Water Solutions in their wastewater treatment works at Crianlarich, Doune, Killearn and Drymen. Although modest in size, each contractor-designed caisson was sunk through a variety of ground and water conditions, illustrating the versatility of the technique and its advantages over more conventional methods of shallow-depth shaft construction. The importance of a comprehensive site investigation programme and the control measures required to satisfy verticality and structural integrity requirements are discussed. The paper concludes with a series of practical guidelines designed to assist those contemplating using the technique, and to remind practitioners of good caisson-sinking practice.
引用
收藏
页码:59 / 70
页数:12
相关论文
共 50 条
  • [41] Examples and Open Problems
    Alvarez Lopez, Jesus A.
    Candel, Alberto
    GENERIC COARSE GEOMETRY OF LEAVES, 2018, 2223 : 133 - 162
  • [42] FIELD TEST OF FLOATING OPEN CAISSON IN QIANTANG ESTUARY
    Jiang Wei Consultant
    ChinaOceanEngineering, 1990, (03) : 249 - 260
  • [43] Parameters calculation for the large open caisson based on quaternion
    Chen Guangbao
    KSCE JOURNAL OF CIVIL ENGINEERING, 2015, 19 (05) : 1492 - 1497
  • [44] Reliability Analysis on Construction Course of Open Caisson Structure
    Zhang, Jicheng
    Yang, Jun
    PROGRESS IN STRUCTURE, PTS 1-4, 2012, 166-169 : 1976 - 1980
  • [45] Research Review on Large Open Caisson Foundations of Bridges
    Shi Z.
    Zhong M.
    Zhou Y.
    Li S.
    Feng C.
    Zhongguo Tiedao Kexue/China Railway Science, 2022, 43 (05): : 11 - 22
  • [46] Undrained bearing capacity of the cutting face for an open caisson
    Royston, Ronan
    Sheil, Brian B.
    Byrne, Byron W.
    GEOTECHNIQUE, 2022, 72 (07): : 632 - 641
  • [47] Calculation mode of side friction for large open caisson
    Ouyang, Xiaoyong
    Zhao, Wenguang
    Li, Jin
    Li, Song
    Journal of Southeast University (English Edition), 2015, 31 (01) : 130 - 136
  • [48] Parameters calculation for the large open caisson based on quaternion
    Chen Guangbao
    KSCE Journal of Civil Engineering, 2015, 19 : 1492 - 1497
  • [49] Field test of floating open caisson in Qiantang Estuary
    Wei, Jiang
    China Ocean Engineering, 1990, 4 (03) : 249 - 260
  • [50] Sinking a jacked caisson within the London Basin geological sequence for the Thames Water Ring Main extension
    Newman, T. G.
    Wong, H. -Y.
    QUARTERLY JOURNAL OF ENGINEERING GEOLOGY AND HYDROGEOLOGY, 2011, 44 (02) : 221 - 232