共 50 条
- [4] Field test on a semi-circular caisson breakwater Coastal Engineering Journal, 1996, 39 (01): : 59 - 78
- [5] Study on Effective Utilization of Water Resources of Qiantang Estuary PROCEEDINGS OF THE 5TH INTERNATIONAL YELLOW RIVER FORUM ON ENSURING WATER RIGHT OF THE RIVER'S DEMAND AND HEALTHY RIVER BASIN MAINTENANCE, VOL II, 2015, : 457 - 463
- [6] Stochastic analysis and simulation for seawall engineering on Qiantang Estuary PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL 1- 6, 2004, : 1687 - 1693
- [8] Design for Open Caisson Foundation of Middle Tower of Oujiang River North Estuary Bridge in Wenzhou Bridge Construction, 2019, 49 (03): : 75 - 79
- [9] Effect of contracted river on tidal bore in Qiantang Estuary Shuikexue Jinzhan/Advances in Water Science, 2024, 35 (03): : 496 - 507