Geometric approach and taboo search for scheduling flexible manufacturing systems

被引:20
|
作者
Mati, Y [1 ]
Rezg, N [1 ]
Xie, XL [1 ]
机构
[1] INRIA, MACSI Project, LGIPM, ENIM, F-57045 Metz, France
来源
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION | 2001年 / 17卷 / 06期
关键词
deadlock avoidance; geometric approach; manufacturing systems; scheduling; taboo search;
D O I
10.1109/70.975998
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper addresses the scheduling and deadlock avoidance of a class of automated manufacturing systems. In such systems, a set of jobs is to be performed on a set of resources and each job requires several operations. An operation may require several types of resources with several units of each type. Further, upon the completion of an operation, its related resources cannot be released until resources needed for the next operation become available. One important characteristic of such systems is the possibility of deadlock. The scheduling problem deals with the allocation of resources such that jobs are completed within a minimal makespan and deadlocks are avoided. We extend the classical geometric approach to solve the two-job case of our model. A greedy algorithm based on this result and the taboo search heuristic are then developed for the general case. Numerical results show that the proposed algorithm is fast and provides good schedules.
引用
收藏
页码:805 / 818
页数:14
相关论文
共 50 条
  • [21] Scheduling of flexible manufacturing systems based on Petri nets and hybrid heuristic search
    Huang, B.
    Sun, Y.
    Sun, Y. M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (16) : 4553 - 4565
  • [22] A heuristic search approach using approximate solutions to Petri net state equations for scheduling flexible manufacturing systems
    Jeng, MD
    Chen, SC
    INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 1998, 10 (02): : 139 - 162
  • [23] Hybrid heuristic search approach for deadlock-free scheduling of flexible manufacturing systems using Petri nets
    Lei, Hang
    Xing, Keyi
    Han, Libin
    Gao, Zhenxin
    APPLIED SOFT COMPUTING, 2017, 55 : 413 - 423
  • [24] A Heuristic Search Approach Using Approximate Solutions to Petri Net State Equations for Scheduling Flexible Manufacturing Systems
    Mu Der Jeng
    Shih Chang Chen
    International Journal of Flexible Manufacturing Systems, 1998, 10 : 139 - 162
  • [25] A SCHEDULING APPROACH FOR A FLEXIBLE MANUFACTURING SYSTEM
    AANEN, E
    GAALMAN, GJ
    NAWIJN, WM
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (10) : 2369 - 2385
  • [26] Using scheduling in flexible manufacturing systems
    McDuffie, EL
    Schneider, M
    Buoni, FB
    Shnaider, E
    Schneider, M
    MartinVega, LA
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 1995, 8 (06) : 681 - 688
  • [27] DECOMPOSITION FOR SCHEDULING FLEXIBLE MANUFACTURING SYSTEMS
    INMAN, RR
    JONES, PC
    OPERATIONS RESEARCH, 1993, 41 (03) : 608 - 617
  • [28] QUALITY IN THE SCHEDULING OF THE FLEXIBLE MANUFACTURING SYSTEMS
    Abrudan, Claudiu
    Marian, Liviu
    QUALITY AND INNOVATION IN ENGINEERING AND MANAGEMENT, 2011, : 1 - 4
  • [29] IFPS - AN APPROACH TO INTELLIGENT PRODUCTION SCHEDULING AND CONTROL OF FLEXIBLE MANUFACTURING SYSTEMS
    FRENZEL, B
    SCHMIDT, G
    ANGEWANDTE INFORMATIK, 1987, (11): : 458 - 464
  • [30] A multi-agent scheduling approach for the flexible manufacturing production systems
    Archimède, B
    Coudert, T
    DISTRIBUTED COMPUTER CONTROL SYSTEMS 1998, 1999, : 143 - 148