Using scheduling in flexible manufacturing systems

被引:2
|
作者
McDuffie, EL
Schneider, M
Buoni, FB
Shnaider, E
Schneider, M
MartinVega, LA
机构
[1] FLORIDA INST TECHNOL, MELBOURNE, FL 32901 USA
[2] LEHIGH UNIV, BETHLEHEM, PA 18015 USA
关键词
automatic scheduling tools; temporal algebra; hybrid systems;
D O I
10.1016/0952-1976(95)00052-6
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper the concept of recursive Alien temporal algebra is fully described along with its relationship to the smart scheduler program and the concept of smart scheduling in general. Flexible manufacturing systems (FMS) are described, and their relationship with smart scheduling is explored. A care study that shows the utility of SSP in an FMS environment is presented in detail. Conclusions about the concept of smart scheduling are presented in closing.
引用
收藏
页码:681 / 688
页数:8
相关论文
共 50 条
  • [1] On scheduling of flexible manufacturing systems
    Wu, Xiqi
    Lou, Tong
    [J]. Wuhan Gongye Daxue Xuebao/Journal of Wuhan University of Technology, 1995, 17 (02):
  • [2] A METHOD OF FLEXIBLE SCHEDULING FOR FLEXIBLE MANUFACTURING SYSTEMS
    CHOI, JG
    HITOMI, K
    ECON, P
    ECON, PE
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 33 (1-3) : 247 - 255
  • [3] DECOMPOSITION FOR SCHEDULING FLEXIBLE MANUFACTURING SYSTEMS
    INMAN, RR
    JONES, PC
    [J]. OPERATIONS RESEARCH, 1993, 41 (03) : 608 - 617
  • [4] QUALITY IN THE SCHEDULING OF THE FLEXIBLE MANUFACTURING SYSTEMS
    Abrudan, Claudiu
    Marian, Liviu
    [J]. QUALITY AND INNOVATION IN ENGINEERING AND MANAGEMENT, 2011, : 1 - 4
  • [5] Scheduling tool for flexible manufacturing systems using hybrid genetic algorithm
    Noor, Sahar
    Khan, M. K.
    Hussain, Iftikhar
    Ullah, Irfan
    [J]. SECOND INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES 2006, PROCEEDINGS, 2006, : 554 - +
  • [6] Optimal routing and scheduling in flexible manufacturing systems using integer programming
    Cogill, Randy
    Hindi, Haitharn
    [J]. PROCEEDINGS OF THE 46TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-14, 2007, : 5375 - +
  • [7] An architecture for scheduling and control in flexible manufacturing systems using distributed objects
    Tai, TT
    Boucher, TO
    [J]. IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2002, 18 (04): : 452 - 462
  • [8] PRIORITY NETS FOR SCHEDULING FLEXIBLE MANUFACTURING SYSTEMS
    RAJU, KR
    CHETTY, OVK
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 1993, 12 (04) : 326 - 340
  • [9] Intelligent scheduling of robots and flexible manufacturing systems
    Borenstein, D
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1999, 50 (03) : 285 - 285
  • [10] A REVIEW OF SCHEDULING RULES IN FLEXIBLE MANUFACTURING SYSTEMS
    GUPTA, YP
    GUPTA, MC
    BECTOR, CR
    [J]. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1989, 2 (06) : 356 - 377