Optimal timing strategy for project evaluation and implementation

被引:0
|
作者
Otazawa, T [1 ]
Kobayashi, K [1 ]
机构
[1] Tohoku Univ, Grad Sch Informat Sci, Sendai, Miyagi, Japan
关键词
project evaluation; real option; integral equation model;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper investigates an economic methodology for project evaluation, which explicitly incorporates evaluation costs and the option value of flexibility in decisions. The traditional cost-benefit analysis is fundamentally based upon a 'now-or-never principle', and fails to evaluate the option value derived by reserving decisions to wait for more concrete information. In this paper, the real option model is formulated to determine the optimal timing strategy for project evaluation and implementation. The optimal solutions of the model can be obtained by solving the integral equation models. This paper is concluded by illustrating numerical examples to demonstrate the availability of the methodology.
引用
收藏
页码:634 / 639
页数:6
相关论文
共 50 条
  • [21] The Implementation and Evaluation of a Pilot Project in Telerheumatology
    Chalmers, Andrew
    Arnold, Hazel
    JOURNAL OF RHEUMATOLOGY, 2010, 37 (06) : 1322 - 1322
  • [22] IMPLEMENTATION AND EVALUATION OF THE NATIONAL TRAINING PROJECT
    Petroulias, D.
    AUSTRALIAN AND NEW ZEALAND JOURNAL OF PSYCHIATRY, 2022, 56 (1_SUPPL): : 110 - 111
  • [23] Optimal timing control in game modeling of an energy project infrastructure
    Krasovskii, Andrey A.
    Matrosov, Ivan V.
    Tarasyev, Alexander M.
    NONLINEAR ANALYSIS-THEORY METHODS & APPLICATIONS, 2009, 71 (12) : E2498 - E2506
  • [24] Timing in-situ Monitors: Implementation Strategy and Applications Results
    Benhassain, A.
    Cacho, F.
    Huard, V.
    Saliva, M.
    Anghel, L.
    Parthasarathy, C.
    Jain, A.
    Giner, F.
    2015 IEEE CUSTOM INTEGRATED CIRCUITS CONFERENCE (CICC), 2015,
  • [25] Implementation of Genetic Algorithm to find the optimal timing of Overcurrent relays
    Pandey, Anand K.
    Kirmani, Sheeraz
    2016 IEEE INTERNATIONAL POWER ELECTRONICS AND MOTION CONTROL CONFERENCE (PEMC), 2016, : 400 - 405
  • [26] Optimal timing for nonsubsidized policy implementation in the electric vehicle industry
    Wang, Suyuan
    Wang, Gengxin
    Song, Huaming
    Huang, Hongfu
    MANAGERIAL AND DECISION ECONOMICS, 2024, 45 (02) : 975 - 988
  • [27] Actual Comprehension of the Project as a Tool of Innovation Strategy Implementation
    Okruhlica, Frantisek
    Marsina, Stefan
    EKONOMICKY CASOPIS, 2012, 60 (05): : 495 - 508
  • [28] Investment project management as instrument of enterprise strategy implementation
    Rebenok, An.
    ACTUAL PROBLEMS OF ECONOMICS, 2008, (79): : 154 - 159
  • [29] IMPLEMENTATION AND EVALUATION OF A COLLABORATIVE GYMNASTIC STRATEGY
    Avalos Ramos, M. A.
    Martinez Ruiz, M. A.
    Merma-Molina, G.
    REVISTA INTERNACIONAL DE MEDICINA Y CIENCIAS DE LA ACTIVIDAD FISICA Y DEL DEPORTE, 2019, 19 (76): : 579 - 598
  • [30] Techno-economic evaluation of regional CCUS implementation: The STRATEGY CCUS project in the Ebro Basin (Spain)
    Fernandez-Canteli alvarez, Paula
    Garcia Crespo, Jesus
    Martinez Orio, Roberto
    Mediato Arribas, Jose Francisco
    Ramos, Adria
    Berrezueta, Edgar
    GREENHOUSE GASES-SCIENCE AND TECHNOLOGY, 2023, 13 (02) : 197 - 215