Measuring change management performance: a case study of a Moroccan construction company

被引:0
|
作者
Errida, Abdelouahab [1 ]
Lotfi, Bouchra [2 ]
Semma, Elalami [1 ]
机构
[1] FST Settat, LIMII Lab, Settat, Morocco
[2] ENSA Berrechid, LIMII Lab, Berrechid, Morocco
关键词
organizational change; change management; performance; balanced scorecard; ORGANIZATIONAL-CHANGE; BALANCED SCORECARD; MODEL; INTEGRATION;
D O I
暂无
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
the purpose of this paper is to propose an approach for measuring the performance of organizational change management within a Moroccan construction company, by adapting the balanced scorecard model to change management context. Also, it presents the main steps to be followed for carrying out the measurement and identifies a set of change management performance measures regarding four different perspectives: results and outcomes, stakeholders, project and change management processes, and learning and growth.
引用
收藏
页码:206 / 213
页数:8
相关论文
共 50 条
  • [21] Investigation of the relationship between the knowledge management process and performance of a construction company: An empirical study
    Wibowo M.A.
    Waluyo R.
    Zhabrinna
    [J]. Interdisciplinary Journal of Information, Knowledge, and Management, 2018, 13 : 417 - 435
  • [22] A CASE STUDY FOR COSTS OPTIMIZATION IN A CONSTRUCTION COMPANY
    Ciplea, Sorina Anamaria
    Anastasiu, Livia
    Sucala, Dorina
    Roman, Maria Nicoleta
    [J]. FROM MANAGEMENT OF CRISIS TO MANAGEMENT IN A TIME OF CRISIS, 2016, : 276 - 282
  • [23] Process and Product Change Management as a Predictor and Innovative Solution for Company Performance: A Case Study on the Optimization Process in the Automotive Industry
    Pop , Bianca Oana
    Popescu, Catalin
    Gabor, Manuela Rozalia
    [J]. APPLIED SYSTEM INNOVATION, 2023, 6 (05)
  • [24] Measuring construction professional services exports: a case for change
    Jewell, Carol
    Flanagan, Roger
    [J]. BUILDING RESEARCH AND INFORMATION, 2012, 40 (03): : 337 - 347
  • [25] THE TRAINING AND COMPETENCE CONSTRUCTION FOR THE EXECUTIVE SECRETARIES SKILLS AND PERFORMANCE - A STUDY OF CASE AT A ENTREPRENEURIAL COMPANY
    Lima, Thays Ferreira
    Cantarotti, Aline
    [J]. REVISTA DE GESTAO E SECRETARIADO-GESEC, 2010, 1 (02): : 94 - 122
  • [26] Application of project-based change management in construction: a case study
    Chen, Chun-Sung
    Tsui, Yu-Kun
    Dzeng, Ren-Jye
    Wang, Wei-Chih
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2015, 21 (01) : 107 - 118
  • [27] MATRIX-BASED CHANGE MANAGEMENT: A CASE STUDY IN A CONSTRUCTION PROJECT
    Chen, Jian Jun
    Li, Simon
    [J]. MANAGING COMPLEXITY BY MODELLING DEPENDENCIES, 2010, : 375 - 380
  • [28] Measuring Safety Climate of a Construction Company
    Choudhry, Rafiq M.
    Fang, Dongping
    Lingard, Helen
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (09) : 890 - 899
  • [29] Rating of Knowledge Management Factors Affecting Construction Company performance
    Alhammadi, Eman Mohammed Abdulrahman
    Kasim, Rozilah
    Lohana, Sonia
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2022, 13 (02): : 134 - 140
  • [30] Prioritizing the Logistics Management Factors Affecting Company Performance: Case Study of ADNOC
    Abdulla, Mohamed Fuad Mohamed Hassan
    Musa, Haslinda
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (05): : 61 - 72