Understanding the critical variables affecting the level of political risks in international construction projects

被引:25
|
作者
Deng Xiaopeng [1 ]
Pheng, Low Sui [2 ]
机构
[1] Southeast Univ, Dept Construct Management & Real Estate, Nanjing 210096, Jiangsu, Peoples R China
[2] Natl Univ Singapore, Dept Bldg, Singapore 117566, Singapore
关键词
political risks; critical variables; international projects; risk management; construction; FOREIGN-INVESTMENT; JOINT VENTURES; ENTRY MODE; MANAGEMENT; FIRMS; STRATEGIES; BUSINESS; IMPACT;
D O I
10.1007/s12205-013-0354-5
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Contractors in the international marketplace are experiencing more severe political risks than ever before. They have also in response endeavored to mitigate the high degree of political risk exposure in order to survive. It is important however to identify and manage the critical variables affecting political risks associated with international construction projects. Relatively few studies of political risks, particularly in the context of international projects, have been carried out. The objective of this paper is to examine how international contractors attempt to identify and manage the critical variables which affect the level of political risks when they venture out of their home countries. 85 variables contributing to the level of political risks encountered by international contractors were identified in this paper. Based on the findings from an international survey on political risks, this study reveals that the variables, such as degree of stability of the government, project desirability to the host country, policy uncertainty, racism and xenophobia, and unfavorable attitude towards foreign businesses are the most significant variables. Several recommendations are also provided for international contractors in this paper. This research will assist international contractors to manage the political risk factors when expanding overseas.
引用
收藏
页码:895 / 907
页数:13
相关论文
共 50 条
  • [41] Probability and Impact Perspectives on Cost and Schedule Risks in International Construction Projects: An Empirical Investigation
    Won, Jin Woo
    Jung, Wooyong
    Baek, Seungwon
    Han, Seung Heon
    KSCE JOURNAL OF CIVIL ENGINEERING, 2024, 28 (07) : 2600 - 2612
  • [42] An analytical study of critical factors affecting contractor efficiency in construction projects in Indian scenario
    Deep, Shumank
    Simon, Laura
    Asim, Mohd
    Rahimzadeh, Ali
    Al-Hamdani, Sulala
    ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2018, 10 (01): : 1794 - 1802
  • [43] Investigation of critical factors affecting cost overruns and delays in Egyptian mega construction projects
    Daoud, Ahmed Osama
    El Hefnawy, Mohammed
    Wefki, Hossam
    ALEXANDRIA ENGINEERING JOURNAL, 2023, 83 : 326 - 334
  • [44] Critical success factors affecting project success in construction projects: A contemporary Indian perspective
    Moza, Amit
    Paul, Virendra Kumar
    JOURNAL OF PROJECT MANAGEMENT, 2024, 9 (02) : 183 - 196
  • [45] Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects
    Larsen, Jesper Kranker
    Shen, Geoffrey Qiping
    Lindhard, Soren Munch
    Brunoe, Thomas Ditlev
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (01)
  • [46] Understanding critical demographic variables affecting patient safety culture from nurses' viewpoints
    Chi, Chih-Yi
    Huang, Chih-Hsuan
    Lee, Yii-Ching
    Wu, Cheng-Feng
    Wu, Hsin-Hung
    TQM JOURNAL, 2020, 32 (03): : 429 - 440
  • [47] Exploring Critical Variables That Affect the Policy Risk Level of Industrial Heritage Projects in China
    Guo, Ping
    Li, Huimin
    Zhang, Guangmin
    Zhang, Yang
    SUSTAINABILITY, 2019, 11 (23)
  • [48] Critical Safety Risks Identification of Bridge Construction Projects in the Marine Environment Based on HHM and SNA
    Wang, Junwu
    Yin, Yuan
    Wu, Han
    Yang, Tingyou
    JOURNAL OF COASTAL RESEARCH, 2020, : 48 - 52
  • [49] Impact of External Risks on International Construction Projects Success: Evidence from Commonwealth Caribbean Islands
    Parra, Hernan Albeiro
    Zuniga-Collazos, Alexander
    Cruz-Caicedo, Luis Fernando
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2023, 28 (01) : 113 - 132
  • [50] Critical factors affecting schedule performance A case of Ethiopian public construction projects - engineers' perspective
    Sinesilassie, Ephrem Girma
    Tabish, Syed Zafar Shahid
    Jha, Kumar Neeraj
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (05) : 757 - 773