Impact of External Risks on International Construction Projects Success: Evidence from Commonwealth Caribbean Islands

被引:0
|
作者
Parra, Hernan Albeiro [1 ]
Zuniga-Collazos, Alexander [1 ]
Cruz-Caicedo, Luis Fernando [1 ]
机构
[1] Univ San Buenaventura, Econ Sci Fac, Cali 760008, Colombia
关键词
Construction project success; Commonwealth Caribbean Islands; International construction project; Risk management; Structural equation model; JOINT VENTURES; DECISION; MITIGATION; VARIABLES; CRITERIA; FIRMS;
D O I
10.21315/jcdc-07-21-0106
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Since risks on international construction show region to region variation, the present study investigates the impact of external risks on international construction project (ICP) success and the relationships between them, from the perspective of construction professionals working in the Commonwealth Caribbean Islands (CCI) states. After a literature review, a survey questionnaire was designed with the input of a small group of experts. An instrument was tested and then sent to the construction professionals working in the CCI. Seventy valid surveys collected were processed using the structural equation model (SEM). The results suggest that the reason why CCI is an attractive region for construction enterprises looking into developing countries is because they do not support a direct impact of external risks on the project success, contrary to the findings in other studies on developing regions. The SEM confirmed that global risks influence economic risks, while economic risks influence legal risks and, in this region, influence the social risks. Results obtained help to address the knowledge gap for the ICP risks for the Caribbean region. The study will help the firms and the professionals looking to venture into the CCI or other regions with similar characteristics to create their risk management plan.
引用
收藏
页码:113 / 132
页数:20
相关论文
共 50 条
  • [1] Identifying Risks on International Construction Projects
    Li Changhua
    Lu Qiuhong
    Leon, Pretorius
    [J]. PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 346 - +
  • [2] Probability and Impact Perspectives on Cost and Schedule Risks in International Construction Projects: An Empirical Investigation
    Won, Jin Woo
    Jung, Wooyong
    Baek, Seungwon
    Han, Seung Heon
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2024, 28 (07) : 2600 - 2612
  • [3] Interenterprise Collaboration Network in International Construction Projects: Evidence from Chinese Construction Enterprises
    Liu, Cong
    Cao, Jiming
    Wu, Guangdong
    Zhao, Xianbo
    Zuo, Jian
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2022, 38 (02)
  • [4] Forming Mechanism of Political Risks in International Construction Projects: From the Perspective of Chinese Contractors
    Ullah, Safi
    Deng, Xiaopeng
    Chang, Tengyuan
    [J]. FRONTIERS IN BUILT ENVIRONMENT, 2019, 5
  • [5] Effect of lean tools to control external environment risks of construction projects
    Ansah, Richard Hannis
    Sorooshian, Shahryar
    [J]. SUSTAINABLE CITIES AND SOCIETY, 2017, 32 : 348 - 356
  • [6] Modeling the international technology transfer process in construction projects: evidence from Thailand
    Waroonkun, Tanut
    Stewart, Rodney Anthony
    [J]. JOURNAL OF TECHNOLOGY TRANSFER, 2008, 33 (06): : 667 - 687
  • [7] Modeling the international technology transfer process in construction projects: evidence from Thailand
    Tanut Waroonkun
    Rodney Anthony Stewart
    [J]. The Journal of Technology Transfer, 2008, 33 : 667 - 687
  • [8] Dynamic Measurement and Evaluation on Foreign Exchange Risks of International Construction Projects
    Wang, X. Q.
    Gao, B.
    [J]. 2012 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2012, : 2103 - 2107
  • [9] Identifying micro variables contributing to political risks in international construction projects
    Deng, Xiaopeng
    Low, Sui Pheng
    Zhao, Xianbo
    Chang, Tengyuan
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (03) : 317 - 334
  • [10] Modelling the risks faced by Indian construction companies assessing international projects
    Jha, Kumar Neeraj
    Devaya, M. N.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2008, 26 (04) : 337 - 348