Project Delivery Selection Matrix for Highway Design and Construction

被引:29
|
作者
Tran, Dai Q. [1 ]
Harper, Christofer M. [1 ]
Molenaar, Keith R. [1 ]
Haddad, Nabil F. [2 ]
Scholfield, Mark M. [3 ]
机构
[1] Univ Colorado, Dept Civil Environm & Architectural Engn, Boulder, CO 80309 USA
[2] Colorado Dept Transportat, Denver, CO 80222 USA
[3] Wilson & Co Inc, Engineers & Architects, Denver, CO 80202 USA
关键词
Colorado department of transportations - Complex Processes - Decision supports - Delivery methods - Design and construction - Highway projects - Highways agency - Industry designs - matrix - Project delivery;
D O I
10.3141/2347-01
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Determining an appropriate delivery method for highway projects is a complex process. This paper presents a decision support approach to assist highway agencies in evaluating and selecting the most suitable delivery method for their projects. The approach uses a matrix to consider three fundamental delivery methods currently in use by the highway industry: design bid build, design build, and construction manager general contractor. The approach, which is in use by the Colorado Department of Transportation (DOT), includes four primary selection factors (delivery schedule, complexity and innovation, level of design, and initial project risk assessment) and four secondary selection factors (cost, staff experience and availability, level of oversight and control, and competition and contractor experience) in the delivery decision. These eight selection factors, along with opportunities and challenges for each delivery method, were identified through a literature search and were tested by discussions and workshops with innovative contracting leaders from the Colorado DOT, FHWA, the American Council of Engineering Companies, Associated General Contractors of America, and the University of Colorado. The approach enables an initial risk assessment to occur early in the project development process and before the project delivery decision. The project delivery selection matrix promotes a better understanding of project goals, risks, and opportunities and enhances alignment among project participants. The approach has been successfully tested and implemented through eight projects of varying scope throughout Colorado. This paper presents the project delivery selection matrix along with an illustrative case study to demonstrate the results. The research provides a defensible and repeatable process for highway agencies to select an appropriate delivery method for their projects.
引用
收藏
页码:3 / 10
页数:8
相关论文
共 50 条
  • [31] HIGHWAY CONSTRUCTION PROJECT VARAZDIN IVANEC KRAPINA
    不详
    GRADEVINAR, 2022, 74 (06): : 549 - 550
  • [32] CONSTRUCTION OF TRANSMAGHREBINE HIGHWAY - MEGA-PROJECT
    Vrancic, Tanja
    GRADEVINAR, 2010, 62 (12): : 1163 - 1164
  • [33] Eliminating economic wastes in construction through the use of prequalification in contractors' selection in construction project delivery in Nigeria
    Alfred, OO
    PROCEEDINGS OF 2005 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 435 - 439
  • [34] Research on Owner Project Management Maturity Model of Highway Construction Project
    Ren, Yaxi
    Jia, Yuanhua
    PROCEEDINGS OF THE 2017 5TH INTERNATIONAL CONFERENCE ON MECHATRONICS, MATERIALS, CHEMISTRY AND COMPUTER ENGINEERING (ICMMCCE 2017), 2017, 141 : 466 - 470
  • [35] Consensus for experimental design in electromyography (CEDE) project: Electrode selection matrix
    Besomi, Manuela
    Hodges, Paul W.
    Van Dieen, Jaap
    Carson, Richard G.
    Clancy, Edward A.
    Disselhorst-Klug, Catherine
    Holobar, AleS
    Hug, Francois
    Kiernan, Matthew C.
    Lowery, Madeleine
    McGill, Kevin
    Merletti, Roberto
    Perreault, Eric
    Sogaard, Karen
    Tucker, Kylie
    Besier, Thor
    Enoka, Roger
    Falla, Deborah
    Farina, Dario
    Gandevia, Simon
    Rothwell, John C.
    Vicenzino, Bill
    Wrigley, Tim
    JOURNAL OF ELECTROMYOGRAPHY AND KINESIOLOGY, 2019, 48 : 128 - 144
  • [36] A Comprehensive Analysis of Change Orders Based on Project Progress in Design-Build Highway Construction
    Oh, Jeongyoon
    Touran, Ali
    D'Angelo, Daniel
    Clark, Tyler
    Gaskins, Chris
    Ashuri, Baabak
    CONSTRUCTION RESEARCH CONGRESS 2024: CONTRACTING, DELIVERY, SCHEDULING, ESTIMATING, ECONOMICS, AND ORGANIZATIONAL MANAGEMENT AND PLANNING IN CONSTRUCTION, 2024, : 135 - 145
  • [37] Managing Financial Implications for Sustainable Highway Project Delivery
    Goh, Kaichen
    Yang, Jay
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 347 - 352
  • [38] Causes of Delay on Highway Construction Project in Klang Valley
    Karunakaran, S.
    Ramli, M. Z.
    Malek, M. A.
    Musir, A. A.
    Imran, N. F.
    Fuad, N. F. S. M.
    Zawawi, M. H.
    Zainal, M. Z.
    GREEN DESIGN AND MANUFACTURE: ADVANCED AND EMERGING APPLICATIONS, 2018, 2030
  • [39] Analysis of Quality Control Measures in Highway Project Construction
    Yang, Huakui
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON EDUCATION, SPORTS, ARTS AND MANAGEMENT ENGINEERING, 2016, 54 : 289 - 293
  • [40] Exploring a Progressive Design-Build Best-Value Delivery Method in Highway Construction
    Alleman, Douglas
    Tran, Dan
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2021, 13 (01)