Project Delivery Selection Matrix for Highway Design and Construction

被引:29
|
作者
Tran, Dai Q. [1 ]
Harper, Christofer M. [1 ]
Molenaar, Keith R. [1 ]
Haddad, Nabil F. [2 ]
Scholfield, Mark M. [3 ]
机构
[1] Univ Colorado, Dept Civil Environm & Architectural Engn, Boulder, CO 80309 USA
[2] Colorado Dept Transportat, Denver, CO 80222 USA
[3] Wilson & Co Inc, Engineers & Architects, Denver, CO 80202 USA
关键词
Colorado department of transportations - Complex Processes - Decision supports - Delivery methods - Design and construction - Highway projects - Highways agency - Industry designs - matrix - Project delivery;
D O I
10.3141/2347-01
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Determining an appropriate delivery method for highway projects is a complex process. This paper presents a decision support approach to assist highway agencies in evaluating and selecting the most suitable delivery method for their projects. The approach uses a matrix to consider three fundamental delivery methods currently in use by the highway industry: design bid build, design build, and construction manager general contractor. The approach, which is in use by the Colorado Department of Transportation (DOT), includes four primary selection factors (delivery schedule, complexity and innovation, level of design, and initial project risk assessment) and four secondary selection factors (cost, staff experience and availability, level of oversight and control, and competition and contractor experience) in the delivery decision. These eight selection factors, along with opportunities and challenges for each delivery method, were identified through a literature search and were tested by discussions and workshops with innovative contracting leaders from the Colorado DOT, FHWA, the American Council of Engineering Companies, Associated General Contractors of America, and the University of Colorado. The approach enables an initial risk assessment to occur early in the project development process and before the project delivery decision. The project delivery selection matrix promotes a better understanding of project goals, risks, and opportunities and enhances alignment among project participants. The approach has been successfully tested and implemented through eight projects of varying scope throughout Colorado. This paper presents the project delivery selection matrix along with an illustrative case study to demonstrate the results. The research provides a defensible and repeatable process for highway agencies to select an appropriate delivery method for their projects.
引用
收藏
页码:3 / 10
页数:8
相关论文
共 50 条
  • [21] Project Delivery Methods' Change-Order Types and Magnitudes Experienced in Highway Construction
    Alleman, Douglas
    Antoine, Arthur L. C.
    Stanford, M. Scott
    Molenaar, Keith R.
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (02)
  • [22] Enhancing design-bid-build project delivery: A comprehensive review and framework for contractor selection and project optimisation in the construction industry
    Almuhannadi, Mohammed Ali
    Ghareeb, Ahmed Salem
    ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2024, 16 (01): : 63 - 80
  • [23] The Future of Highway and Bridge Construction: Digital Project Delivery Using Integrated Advanced Technologies
    Subramanya, Karthik
    Kermanshachi, Sharareh
    Patel, Ronik Ketankumar
    INTERNATIONAL CONFERENCE ON TRANSPORTATION AND DEVELOPMENT 2022: INFRASTRUCTURE SYSTEMS, 2022, : 14 - 25
  • [24] Shakwak highway project - Construction challenges
    Walsh, R
    MacLeod, D
    Cook, D
    COLD REGIONS ENGINEERING: THE COLD REGIONS INFRASTRUCTURE: AN INTERNATIONAL IMPERATIVE FOR THE 21ST CENTURY, 1996, : 640 - 651
  • [25] Lessons Learned from Selection of Project Delivery Methods in Highway Projects: The Texas Experience
    Demetracopoulou, Vassiliki
    O'Brien, William J.
    Khwaja, Nabeel
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (01)
  • [26] Empirical Inference System for Highway Project Delivery Selection Using Fuzzy Pattern Recognition
    Nguyen, Phuong H. D.
    Tran, Dai Q.
    Lines, Brian C.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (12)
  • [27] Research on Factors Influencing Project Delivery System selection for Construction Projects
    Liu, Bingsheng
    Fu, Meiqing
    Shen, Geoffrey
    Tai, Shuangliang
    Zhang, Shiruo
    ICCREM 2017: PROJECT MANAGEMENT AND CONSTRUCTION TECHNOLOGY, 2017, : 292 - 302
  • [28] Matrix for project delivery
    Constr Specifier, 3 (48):
  • [29] Lesotho Highlands water project - design and construction of the delivery tunnel
    Featherstone, GA
    Darby, AW
    deWitt, MJ
    Fraser, RM
    Matchett, JM
    Rule, TAP
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1997, 120 : 54 - 64
  • [30] Assessment of the impact of design documentation quality on construction project delivery
    Agbaxode P.D.K.
    Saghatforoush E.
    Dlamini S.
    Journal of Engineering, Project, and Production Management, 2023, 13 (02) : 81 - 92