Reliability-based risk assessment in coastal projects: Case study in Turkey

被引:17
|
作者
Balas, CE [1 ]
Ergin, A
机构
[1] Gazi Univ, Fac Engn & Architecture, Dept Civil Engn, TR-06570 Ankara, Turkey
[2] Middle E Tech Univ, Fac Engn, Dept Civil Engn, TR-06531 Ankara, Turkey
关键词
risk analysis; Turkey; case reports; coastal structures; rubble-mound breakwaters; limit states;
D O I
10.1061/(ASCE)0733-950X(2002)128:2(52)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The risk of damage during the construction phase of a coastal structure was investigated by utilizing Level II and III reliability methods. Structural risks were incorporated in the planning phase of coastal projects by utilizing a practical risk management approach implemented in the Mezitli (Icel) Yacht Harbor project in Turkey. By specifying the exceedance probability of damage level at the design stage, the delay times of construction activities due to damage were obtained at the project-planning phase, which enabled the estimation of the project completion time. It is found that structural risk of damage in the construction period can be an important factor to be considered in the reliability-based project management. because coastal projects involve considerable damage risk during the construction phase. The application of Monte Carlo simulations (Level III), which is generally performed within a few minutes of CPU time in fast computers, has the advantage of robustness when compared with the second-order methods such as the Hasofer-Lind method, provided that the probability distribution of random variables and their correlation are described with an acceptable accuracy, which should be obtained from data accumulated over a sufficient number of years. In this study, by specifying the exceedance probability of "no damage level" at the design stage, the probability of construction completion times were estimated at the planning phase for the case study of Mezitli Yacht Harbor, where the probability distributions of random variables were obtained from the governmental archives.
引用
收藏
页码:52 / 61
页数:10
相关论文
共 50 条
  • [31] Reliability-based assessment of masonry arch bridges
    Casas, Joan R.
    [J]. CONSTRUCTION AND BUILDING MATERIALS, 2011, 25 (04) : 1621 - 1631
  • [32] RELIABILITY-BASED ASSESSMENT FOR FATIGUE INTEGRITY MANAGEMENT
    Manzocchi, M.
    Shetty, N.
    Stacey, A.
    [J]. PROCEEDINGS OF THE 27TH INTERNATIONAL CONFERENCE ON OFFSHORE MECHANICS AND ARCTIC ENGINEERING - 2008, VOL 5, 2008, : 293 - 304
  • [33] Risk assessment: method and case study for traffic projects
    Yu X.
    Prevedouros P.D.
    [J]. Journal of Modern Transportation, 2017, 25 (4): : 236 - 249
  • [34] Risk assessment of submarine pipelines: A case study in Turkey
    Durap, Ahmet
    Balas, Can Elmar
    [J]. OCEAN ENGINEERING, 2022, 261
  • [35] Risk assessment of vertical breakwaters - A case study in Turkey
    Balas, CE
    Koc, L
    [J]. CHINA OCEAN ENGINEERING, 2002, 16 (01) : 123 - 134
  • [36] Risk Assessment of Vertical Breakwaters -A Case Study in Turkey
    CanElmarBALAS
    LeventKOC
    [J]. China Ocean Engineering, 2002, (01) : 123 - 134
  • [37] Risk assessment of vertical breakwaters - A case study in Turkey
    Balas, Can Elmar
    Koc, Levent
    [J]. 2002, Chinese Ocean Engineering Society (16)
  • [38] Coastal revetment risk assessment: A case study in UK
    Williams, AT
    Ergin, A
    Balas, CE
    [J]. PROCEEDINGS OF THE NINTH (1999) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL IV, 1999, 1999, : 369 - 374
  • [39] Reliability-Based Assessment and Cost Analysis of Power Distribution Systems at Risk of Tornado Hazard
    Braik, Abdullah M.
    Salman, Abdullahi M.
    Li, Yue
    [J]. ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2020, 6 (02):
  • [40] Enhanced sequential optimization and reliability assessment for reliability-based design optimization
    Huang, Hong-Zhong
    Zhang, Xudong
    Liu, Yu
    Meng, Debiao
    Wang, Zhonglai
    [J]. JOURNAL OF MECHANICAL SCIENCE AND TECHNOLOGY, 2012, 26 (07) : 2039 - 2043