共 34 条
- [21] APPLICATION OF DYNAMIC-PROGRAMMING TO THE GRADE CONTROL AND SCHEDULING IN A CUT-AND-FILL MINING METHOD 21ST APPLICATION OF THE COMPUTERS AND OPERATIONS RESEARCH IN THE MINERAL INDUSTRY, 1989, : 479 - 484
- [22] THE EVOLUTION OF CUT-AND-FILL MINING TECHNIQUES AT THE INCO-LIMITED LEVACK AREA MINES CIM BULLETIN, 1981, 74 (825): : 63 - 74
- [24] EXPERIMENT AND RESEARCH IN UNDERHAND CUT-AND-FILL MINING METHOD IN LINGSHAN No5 VEIN. Changsha Kuangshan Yanjiuyuan Jikan/Quarterly of the Changsha Institute of Mining Research, 1985, 5 (04): : 1 - 8
- [25] CONVERSION FROM POST PILLAR CUT-AND-FILL MINING TO BLASTHOLE - A CASE-STUDY AT FALCONBRIDGE CIM BULLETIN, 1983, 76 (849): : 61 - 68
- [26] REPORT ON IMPROVEMENTS IN DRILLING AND BLASTING PRACTICES AT IOCS CAROL LAKE PROJECT CIM BULLETIN, 1978, 71 (797): : 73 - 80
- [28] Stability of Coal Pillars and Backfill Due to Intermittent Cut-and-Fill Mining Under Loose Aquifer ENGINEERING GEOLOGY FOR A HABITABLE EARTH, VOL 2, IAEG XIV CONGRESS 2023, 2024, : 413 - 428
- [30] STOPES WALLS STABILIZATION AT THE RICH IRON ORE MINING BY THE FLAT-BACK CUT-AND-FILL METHOD JOURNAL OF MINING INSTITUTE, 2014, 207 : 26 - 32