共 13 条
- [1] Underhand Cut-and-Fill Mining with Cemented Backfill. [J]. Rudarsko-metalurski zbornik, 1984, 31 (02): : 123 - 150
- [2] Practices of underhand high drifted cut-and-fill mining [J]. Kuangye Yanjiu Yu Kaifa/Mining Research and Development, 2001, 21 (04): : 7 - 8
- [6] Cemented Paste Backfill Geomechanics at a Narrow-Vein Underhand Cut-and-Fill Mine [J]. Rock Mechanics and Rock Engineering, 2019, 52 : 4925 - 4940
- [8] Evaluation of crown pillar burst potential in cut-and-fill vein mining [J]. AusIMM Proceedings, 2001, 306 (01): : 53 - 58
- [9] APPLICATION OF DYNAMIC-PROGRAMMING TO THE GRADE CONTROL AND SCHEDULING IN A CUT-AND-FILL MINING METHOD [J]. 21ST APPLICATION OF THE COMPUTERS AND OPERATIONS RESEARCH IN THE MINERAL INDUSTRY, 1989, : 479 - 484