Gyopo Bridge: A Double-Tied Arch Bridge in Poseung-Pyeongtaek Railroad

被引:5
|
作者
Kim, Woo Jong [1 ]
Cho, Kyung Sik [1 ]
Lee, Chi Dong [1 ]
Kim, Chang Su [1 ]
An, Ki Up [1 ]
Choi, Jee Hoon
机构
[1] DM Engn Co Ltd, Seoul, South Korea
关键词
Gyopo Railroad Bridge; arch bridges; double-tied arch; less vibration; basket handle type; small displacement;
D O I
10.2749/101686612X13216060212915
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Gyopo Bridge is an arch railroad bridge connecting the US military base in Pyeongtaek to the Poseung-Pyeongtaek Railroad. The bridge was designed as a uniquely shaped arch to represent the international cooperation between South Korea and the United States, and also to create visual harmony with Ansung River. The Gyopo Bridge is the longest railroad bridge in South Korea with a new concept, double-tied arch system. The Gyopo Bridge has a single track with a 9,10 m wide deck and a three-span continuous arch with a 130,00 m long main span and 51,20 m long side spans (232,40 m in total). The double-tied arch bridge system is a new structural concept that has strengthened the arch ribs of the previous single-tied arch bridge system using "secondary tension tie". Owing to the secondary tension tie, it is also easy to extend the span length of a double-tied arch bridge by increasing the stiffness of arch ribs. Furthermore, the double-tied arch system can reduce the vibration of the bridge, which will eventually improve the driving safety of traveling trains and prolong the fatigue life of the bridge members.
引用
收藏
页码:26 / 28
页数:3
相关论文
共 50 条
  • [41] EXPERIMENTAL STUDY ON COMPOSITE DECK OF THROUGH TIED-ARCH BRIDGE
    Zhou, De
    Ye, Mei-Xin
    Chen, Jia
    4TH INTERNATIONAL SYMPOSIUM ON LIFETIME ENGINEERING OF CIVIL INFRASTRUCTURE, 2009, : 548 - 554
  • [42] Study on loading test of the sub-arch bridge of double-decker CFST arch bridge
    Xing, Yan
    Shen, Dan
    Yu, Xiaolin
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON HEALTH MONITORING OF STRUCTURE, MATERIALS AND ENVIRONMENT, VOLS 1 AND 2, 2007, : 847 - +
  • [43] EXPERIMENTAL RESEARCH OF VEHICLE-BRIDGE COUPLING VIBRATION OF DOUBLE ARCH BRIDGE
    Meng, Yang-Jun
    Zhou, Xian-Yan
    Chen, Qiang
    4TH INTERNATIONAL SYMPOSIUM ON LIFETIME ENGINEERING OF CIVIL INFRASTRUCTURE, 2009, : 649 - 653
  • [44] Life prediction of Nanjing Yangtze River Bridge double arch approach bridge
    Xu, C. F.
    Li, D. L.
    Ma, M. Y.
    Cao, S. Y.
    Guo, J.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, LIFE-CYCLE SUSTAINABILITY AND INNOVATIONS, 2021, : 3373 - 3378
  • [45] Experimental Study on Load of Concrete Filled Steel Tubular Double-rib Tied-arch Bridge
    Hao, Zhang
    2020 2ND GLOBAL CONFERENCE ON ECOLOGICAL ENVIRONMENT AND CIVIL ENGINEERING, 2020, 568
  • [46] Optimization of hanger arrangement in pedestrian tied arch bridge with sparse hanger system
    Tan, Yonggang
    Yao, Yuanbin
    ADVANCES IN STRUCTURAL ENGINEERING, 2019, 22 (12) : 2594 - 2604
  • [47] Dynamic Effect of Tie-Bar Failure on Through Tied Arch Bridge
    Fan, Bing-hui
    Wang, Su-guo
    Chen, Bao-chun
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2020, 34 (05)
  • [48] Distribution law of corrosion pits on steel suspension wires for a tied arch bridge
    Miao, Changqing
    Yu, Jie
    Mei, Mingxing
    ANTI-CORROSION METHODS AND MATERIALS, 2016, 63 (03) : 166 - 170
  • [49] Automatic Identification of Fundamental Frequency for Tied Arch Bridge Suspender Tension Monitoring
    Li, Yi
    Xiang, Yi-Qiang
    Chen, Bao-Chun
    SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 2429 - +
  • [50] The Amelia Earhart network tied arch bridge replacement project, MO, USA
    McCombs, Natalie
    Hurt, Mark
    Konda, Travis
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2023, 176 (04) : 304 - 314