Gyopo Bridge: A Double-Tied Arch Bridge in Poseung-Pyeongtaek Railroad

被引:5
|
作者
Kim, Woo Jong [1 ]
Cho, Kyung Sik [1 ]
Lee, Chi Dong [1 ]
Kim, Chang Su [1 ]
An, Ki Up [1 ]
Choi, Jee Hoon
机构
[1] DM Engn Co Ltd, Seoul, South Korea
关键词
Gyopo Railroad Bridge; arch bridges; double-tied arch; less vibration; basket handle type; small displacement;
D O I
10.2749/101686612X13216060212915
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Gyopo Bridge is an arch railroad bridge connecting the US military base in Pyeongtaek to the Poseung-Pyeongtaek Railroad. The bridge was designed as a uniquely shaped arch to represent the international cooperation between South Korea and the United States, and also to create visual harmony with Ansung River. The Gyopo Bridge is the longest railroad bridge in South Korea with a new concept, double-tied arch system. The Gyopo Bridge has a single track with a 9,10 m wide deck and a three-span continuous arch with a 130,00 m long main span and 51,20 m long side spans (232,40 m in total). The double-tied arch bridge system is a new structural concept that has strengthened the arch ribs of the previous single-tied arch bridge system using "secondary tension tie". Owing to the secondary tension tie, it is also easy to extend the span length of a double-tied arch bridge by increasing the stiffness of arch ribs. Furthermore, the double-tied arch system can reduce the vibration of the bridge, which will eventually improve the driving safety of traveling trains and prolong the fatigue life of the bridge members.
引用
收藏
页码:26 / 28
页数:3
相关论文
共 50 条
  • [11] Dynamic Performance and Seismic Analysis of Tied Arch Bridge
    Jun, Wu Hui
    Liang, Qiu Wen
    TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 1119 - +
  • [12] Evaluation and retrofit of floorbeam cracking on a tied arch bridge
    Connor, R. J.
    Hodgson, I. C.
    Fisher, J. W.
    BRIDGE STRUCTURES, 2005, 1 (03) : 177 - 193
  • [13] Static and Dynamic Analysis of A through Tied Arch Bridge
    Jiang, Xijuan
    Wang, Lei
    Zhang, Hongbin
    2018 4TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND MATERIAL APPLICATION, 2019, 252
  • [14] Assessment of Embodied Carbon in a Tied-Arch Bridge
    Ruck, Natalie
    Naraidoo, Elenor
    Liu, Chenying
    Kamali, Mohammadreza
    Karabulut, Burak
    Rossi, Barbara
    ce/papers, 2023, 6 (3-4) : 489 - 494
  • [15] In-situ test and dynamic response of a double-deck tied-arch bridge
    Gou, Hongye
    Zhou, Wen
    Chen, Genda
    Bao, Yi
    Pu, Qianhui
    STEEL AND COMPOSITE STRUCTURES, 2018, 27 (02): : 161 - 175
  • [16] Evaluation of Reinforcement Effect of an RC Tied Arch Bridge Based on Vehicle Bridge Coupled Vibration
    Luan, Juan
    Hao, Xian-Wu
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2018, 31 (06): : 227 - 234
  • [17] Practical method for lateral stability of tied through arch bridge
    Chen, Kongliang
    Wang, Ronghui
    Cai, Lurong
    Chen, K. (ckongliang@163.com), 2012, Advanced Institute of Convergence Information Technology, Myoungbo Bldg 3F,, Bumin-dong 1-ga, Seo-gu, Busan, 602-816, Korea, Republic of (04): : 90 - 99
  • [18] Innovation concentrated - Regenbrucke Stefling: a tied arch bridge in concrete
    Stetter, Hans
    Hentschinski, Stefan
    Fritsche, Thomas
    Beton- und Stahlbetonbau, 2015, 110 (10) : 710 - U160
  • [19] FINITE ELEMENT ANALYSIS OF TIED ARCH BRIDGE FOR SUSPENDERS REPLACEMENT
    Zhao Yang
    Li Xiaoke
    Zhao Shunbo
    Yu Ya'nan
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INSPECTION APPRAISAL REPAIRS AND MAINTENANCE OF STRUCTURES, VOLS 1 AND 2, 2010, : 1531 - 1534
  • [20] Experiments for damage detection by subspace identification on a tied arch bridge
    Ebert, Carsten
    Lenzen, Armin
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 1632 - 1638