共 36 条
- [21] Comprehensive evaluation with variable fuzzy sets for global stability of high-steep rock slope of Three Gorges Project permanent shiplock DAMS AND RESERVOIRS, SOCIETIES AND ENVIRONMENT IN THE 21ST CENTURY, VOLS 1 AND 2, 2006, : 707 - +
- [22] Longitudinal variation of channel evolution along the middle Yangtze River after the operation of the Three Gorges Project Hupo Kexue/Journal of Lake Sciences, 2023, 35 (02): : 642 - 649
- [23] Analysis and prediction for the deformation in deep rock mass behind high excavated rocky slope of TGP's permanent shiplock Renmin Changjiang/Yangtze River, 2002, 33 (04):
- [27] The scouring and siltation in river channels of the middle reaches of the Yangtze River (1975-2017) before/after the Three Gorges Project Hupo Kexue/Journal of Lake Sciences, 2021, 33 (05): : 1520 - 1531
- [28] Scouring effect of the middle and lower reaches of the Yangtze River and its impact after the impoundment of the Three Gorges Project Hupo Kexue/Journal of Lake Sciences, 2023, 35 (02): : 650 - 661
- [30] An approach on flood control strategy in middle and lower reaches of Yangtze River after the completion of the Three Gorges Dam project Shuikexue Jinzhan/Advances in Water Science, 2014, 25 (05): : 745 - 751