共 50 条
- [1] Analysis of equilibrium sediment transport in the middle and lower reaches of the Yangtze River after the impoundment of the Three Gorges Reservoir [J]. Hupo Kexue/Journal of Lake Sciences, 2021, 33 (03): : 806 - 818
- [2] The scouring and siltation in river channels of the middle reaches of the Yangtze River (1975-2017) before/after the Three Gorges Project [J]. Hupo Kexue/Journal of Lake Sciences, 2021, 33 (05): : 1520 - 1531
- [3] Mechanism of adjustment of scouring and silting of Chenglingji-Jiujiang reach in the middle reaches of the Yangtze River after impoundment of the Three Gorges Dam [J]. Shuikexue Jinzhan/Advances in Water Science, 2020, 31 (02): : 162 - 171
- [4] Channel degradation in the Yangtze River after the impoundment of the Three Gorges Project [J]. SEDIMENT PROBLEMS AND SEDIMENT MANAGEMENT IN ASIAN RIVER BASINS, 2011, 349 : 154 - 162
- [5] Characteristics of discharge frequency and their effects on flood channel formation in the middle and lower reaches of the Yangtze River before/after the impoundment of the Three Gorges Reservoir [J]. Hupo Kexue/Journal of Lake Sciences, 2022, 34 (02): : 616 - 629
- [6] Study on the influence of the Three Gorges Project on the middle and lower Yangtze River [J]. RIVER SEDIMENTATION: THEORY AND APPLICATIONS, 1999, : 421 - 425