A Differential Evolution Algorithm for the Economic Lot Scheduling Problem

被引:0
|
作者
Tasgetiren, M. Fatih [1 ]
Bulut, Onder [1 ]
Fadiloglu, M. Murat [2 ]
机构
[1] Yasar Univ, Dept Ind Engn, Izmir, Turkey
[2] Izmir Univ Econ, Ind & Syst Engn, Izmir, Turkey
关键词
Economic lot scheduling; differential evolution; heuristic optimization; BASIC PERIOD; SIZES;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this study we provide a Differential Evolution (DE) based heuristic to solve the Economic Lot Scheduling Problem (ELSP) under basic period approach. The problem is to find the best cyclic production schedule of n items to be produced on a single machine such that the production cycle of each item is an integer multiple of the basic period. The demand and the production rates are deterministic and known in advance. Our computational results suggest that our algorithm is competitive with the existing genetic algorithm, and therefore it is promising for the solution of a generalized version of the problem which is called extended basic period approach in the future.
引用
下载
收藏
页码:157 / 162
页数:6
相关论文
共 50 条
  • [1] A Hybrid Discrete Differential Evolution Algorithm for Economic Lot Scheduling Problem with Time Variant Lot Sizing
    Ganguly, Srinjoy
    Chowdhury, Arkabandhu
    Mukherjee, Swahum
    Suganthan, P. N.
    Das, Swagatam
    Chua, Tay Jin
    SOFT COMPUTING MODELS IN INDUSTRIAL AND ENVIRONMENTAL APPLICATIONS, 2013, 188 : 1 - +
  • [2] New Algorithm for Economic Lot Scheduling Problem
    Luo, Rongwu
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 334 - 337
  • [3] A Differential Evolution Algorithm for Lot-Streaming Flow Shop Scheduling Problem
    Sang, Hongyan
    Gao, Liang
    Li, Xinyu
    ADVANCED INTELLIGENT COMPUTING, 2011, 6838 : 576 - 583
  • [4] A STEPWISE PARTIAL ENUMERATION ALGORITHM FOR THE ECONOMIC LOT SCHEDULING PROBLEM
    PARK, KS
    YUN, DK
    IIE TRANSACTIONS, 1984, 16 (04) : 363 - 370
  • [5] Hybrid genetic algorithm for the economic lot-scheduling problem
    Moon, I
    Silver, EA
    Choi, S
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (04) : 809 - 824
  • [6] A tabu search algorithm for solving economic lot scheduling problem
    Raza, S. A.
    Akgunduz, A.
    Chen, M. Y.
    JOURNAL OF HEURISTICS, 2006, 12 (06) : 413 - 426
  • [7] A genetic algorithm for solving the economic lot scheduling problem with reworks
    Chang, Yu-Jen
    Yao, Ming-Jong
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 294 - 306
  • [8] A genetic algorithm for solving economic lot size scheduling problem
    Sarker, R
    Newton, C
    COMPUTERS & INDUSTRIAL ENGINEERING, 2002, 42 (2-4) : 189 - 198
  • [9] A tabu search algorithm for solving economic lot scheduling problem
    S. A. Raza
    A. Akgunduz
    M. Y. Chen
    Journal of Heuristics, 2006, 12
  • [10] A GENETIC ALGORITHM FOR SOLVING THE ECONOMIC LOT SCHEDULING PROBLEM WITH REWORKS
    Chang, Yu-Jen
    Yao, Ming-Jong
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2009, 26 (05) : 411 - 425