Impact of Correlation on Cost-Risk Analysis for Construction Highway Projects

被引:0
|
作者
Tran, Dai [1 ]
Bypaneni, Sai [1 ]
机构
[1] Univ Kansas, Dept Civil Environm & Architectural Engn, Lawrence, KS 66045 USA
关键词
VARIABLES; MODEL;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Major construction projects are often constructed by dividing the project into smaller, more manageable segments. Managing these projects is a complex task due to risk and uncertainty. Many studies have proposed risk analysis frameworks to analyze the impact of risk on project outcomes. However, a limited study has addressed the effect of considering correlations on the cost-risk analysis frameworks. Capturing correlation between variables during the risk analysis process is an important, but a challenging task. This paper examines the impact of correlation between project phases/segments on total project cost. The Federal Highway Administrative cost-risk analysis framework was investigated. The correlation coefficient assessment was determined based on a comprehensive review of literature and several risk management frameworks used in transportation and transit sectors. The paper includes a case example that discusses the impact of correlation on the total project cost uncertainty in detail. The findings from this paper contribute to a construction risk analysis and management domain by showing the effect of considering correlation on the cost-risk analysis process. The results from this paper also help the highway industry to better manage their projects by performing a more accurate risk cost estimate.
引用
收藏
页码:668 / 678
页数:11
相关论文
共 50 条
  • [21] Knowledge based decision support tool for duration and cost overrun analysis of highway construction projects
    Arun, C.
    Rao, B.N.
    [J]. Journal of the Institution of Engineers (India): Civil Engineering Division, 2007, 88 (AUG.): : 27 - 33
  • [22] Diagnose the Causes of Cost Deviation in Highway Construction Projects by Using Root Cause Analysis Techniques
    Al-Zwainy, Faiq M. S.
    Mezher, Reem Amer
    [J]. ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2018, 43 (04) : 2001 - 2012
  • [23] Identification of Factors Influencing Time and Cost Risks in Highway Construction Projects
    Bakri, Anis Sazira
    Ab Razak, Muhammad Aminudin
    Abd Shukor, Ani Saifuza
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (03): : 280 - 288
  • [24] Two-staged early cost estimation for highway construction projects
    Kim, Du Yon
    Kim, Byoungil
    Han, Seung Heon
    [J]. 25TH INTERNATIONAL SYMPOSIUM ON AUTOMATION AND ROBOTICS IN CONSTRUCTION - ISARC-2008, 2008, : 490 - 495
  • [25] Development of a Model for Risk and Cost Analysis in Overseas Plant Construction Projects Focusing on Petrochemical Plant Construction Projects
    Kim, Yong-Su
    Kang, Hyun-Wook
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (05) : 1549 - 1562
  • [26] Development of a model for risk and cost analysis in overseas plant construction projects focusing on petrochemical plant construction projects
    Yong-Su Kim
    Hyun-Wook Kang
    [J]. KSCE Journal of Civil Engineering, 2017, 21 : 1549 - 1562
  • [27] Multicriteria Health and Safety Risk Assessments in Highway Construction Projects
    Koulinas, Georgios K.
    Demesouka, Olympia E.
    Marhavilas, Panagiotis K.
    Orfanos, Nikolaos I.
    Koulouriotis, Dimitrios E.
    [J]. SUSTAINABILITY, 2023, 15 (12)
  • [28] Modeling the Construction Risk Ratings to Estimate the Contingency in Highway Projects
    Diab, Mohamed F.
    Varma, Amiy
    Panthi, Kamalesh
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (08)
  • [29] An Evaluation of Risk Impacting Highway and Road Construction Projects in Nigeria
    Chileshe, Nicholas
    Awotunde, Gabriel Babajide
    [J]. PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 336 - 344
  • [30] Cost-risk contingency framework for managing cost overrun in metropolitan projects: using fuzzy-AHP and simulation
    Afzal, Farman
    Shao, Yunfei
    Junaid, Danish
    Hanif, Muhammad Shehzad
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2020, 13 (05) : 1121 - 1139