Keys to Successful Delivery of a Design-Build Pipeline

被引:0
|
作者
Harris, Gregory S. [1 ]
Atkinson, Janet L. [2 ]
Carpenter, Matthew B. [2 ]
机构
[1] Stantec Consulting Serv Inc, 2353 130th Ave NE, Bellevue, WA 98005 USA
[2] Stantec Consulting Serv Inc, 3301 C St,Suite 1900, Sacramento, CA 95816 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Design-build delivery opportunities for pipeline projects are increasing dramatically in the water and wastewater sector. As an informative example of successful delivery of a design-build pipeline, we will discuss the city of Modesto (City) North Valley Regional Recycled Water Program (NVRRWP) Pipeline in Modesto, California. The pipeline will convey highly-treated wastewater from the City's tertiary treatment plant and serve as an important regional solution to address water supply shortages faced by agricultural customers. This case study will explore various keys to successful delivery of the 7 mi (11.2 km), 42-in (1.06 m) diameter recycled water pipeline that included a 2,800 ft (853 m) long horizontal directionally drilled (HDD) trenchless crossing of the San Joaquin River in an environmentally sensitive area with seismically sensitive soils, including: 1) development of a successful design-build proposal: we will share strategies on how to structure an effective design-build team and prepare a winning proposal; 2) delivery strategies to fast-track schedule including early procurement and contract packages; 3) addressing open cut and trenchless design and construction issues that included balancing pipe/embedment design optimization in poor soils areas, geotechnical/seismic challenges through the San Joaquin floodplain, and schedule delays due to high San Joaquin River levels; 4) satisfying challenging environmental and regulatory agency permit conditions for the HDD crossing of the San Joaquin River using a collaborative approach between owner, contractor, designer, and agencies.
引用
收藏
页码:305 / 317
页数:13
相关论文
共 50 条
  • [41] Five roads to design-build
    Consulting-Specifying Engineer, 1997, 22 (01):
  • [42] DESIGN-BUILD BRINGS A RESPONSE
    WILLIS, SK
    CONSULTING ENGINEER, 1984, 62 (05): : 16 - &
  • [43] DESIGN-BUILD GOES PUBLIC
    DENNING, J
    CIVIL ENGINEERING, 1992, 62 (07): : 76 - 79
  • [44] Ethics in the design-build process
    Zechman, E
    JOURNAL OF PROFESSIONAL ISSUES IN ENGINEERING EDUCATION AND PRACTICE, 2000, 126 (03) : 101 - 102
  • [45] Exploring the impact of project size on design-bid-build and design-build project delivery performance in highways
    Nguyen, Phuong H. D.
    Tran, Dai Q.
    Bypaneni, Sai P. K.
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2021, 39 (11) : 879 - 893
  • [46] Design-build: A total team
    Fischer, P
    Greenwood, D
    JOURNAL AMERICAN WATER WORKS ASSOCIATION, 2000, 92 (11): : 42 - 43
  • [47] Design-build origins in question
    Stephan, DE
    CIVIL ENGINEERING, 1996, 66 (08): : 26 - 26
  • [48] View of the design-build process
    Gordon, Steve
    Construction Specifier, 1997, 50 (05):
  • [49] PACKAGE DEAL + DESIGN-BUILD
    HOYT, CK
    ARCHITECTURAL RECORD, 1993, 181 (11) : 36 - 37
  • [50] Performance of a design-build project
    Smith, Ross J.
    Jaffe, Rochelle C.
    Forensic Engineering, Proceedings of the Congress, 2007, 217 : 476 - 488