Keys to Successful Delivery of a Design-Build Pipeline

被引:0
|
作者
Harris, Gregory S. [1 ]
Atkinson, Janet L. [2 ]
Carpenter, Matthew B. [2 ]
机构
[1] Stantec Consulting Serv Inc, 2353 130th Ave NE, Bellevue, WA 98005 USA
[2] Stantec Consulting Serv Inc, 3301 C St,Suite 1900, Sacramento, CA 95816 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Design-build delivery opportunities for pipeline projects are increasing dramatically in the water and wastewater sector. As an informative example of successful delivery of a design-build pipeline, we will discuss the city of Modesto (City) North Valley Regional Recycled Water Program (NVRRWP) Pipeline in Modesto, California. The pipeline will convey highly-treated wastewater from the City's tertiary treatment plant and serve as an important regional solution to address water supply shortages faced by agricultural customers. This case study will explore various keys to successful delivery of the 7 mi (11.2 km), 42-in (1.06 m) diameter recycled water pipeline that included a 2,800 ft (853 m) long horizontal directionally drilled (HDD) trenchless crossing of the San Joaquin River in an environmentally sensitive area with seismically sensitive soils, including: 1) development of a successful design-build proposal: we will share strategies on how to structure an effective design-build team and prepare a winning proposal; 2) delivery strategies to fast-track schedule including early procurement and contract packages; 3) addressing open cut and trenchless design and construction issues that included balancing pipe/embedment design optimization in poor soils areas, geotechnical/seismic challenges through the San Joaquin floodplain, and schedule delays due to high San Joaquin River levels; 4) satisfying challenging environmental and regulatory agency permit conditions for the HDD crossing of the San Joaquin River using a collaborative approach between owner, contractor, designer, and agencies.
引用
收藏
页码:305 / 317
页数:13
相关论文
共 50 条
  • [21] Design-build in Alaska
    Porter, NC
    ARCHITECTURE, 2004, 93 (02): : 10 - 10
  • [22] DOCUMENTING DESIGN-BUILD
    GURRY, WW
    CIVIL ENGINEERING, 1995, 65 (09): : 47 - 49
  • [23] Design-Build Delivery of Off-Site Conveyance Facilities
    Tack, Frederick
    Danielson, Ryan
    Slagel, Phil
    PIPELINES 2017: PLANNING AND DESIGN, 2017, : 345 - 352
  • [24] Underground design-build contract delivery: the designer's perspective
    Romero, VS
    Adams, DN
    NORTH AMERICAN TUNNELING 2000: UNDERGROUND CONSTRUCTION: THE REVOLUTION CONTINUES, 2000, : 287 - 297
  • [25] Comparison of Cost and Time Performance of Design-Build and Design-Bid-Build Delivery Systems in Florida
    Minchin, R. Edward, Jr.
    Li, Xiaoxiao
    Issa, Raja R.
    Vargas, Gary G.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (10)
  • [26] Integrated Project Controlling Management under Design-Build Delivery System
    Xiu, Xiao-bei
    NINTH CHINA PROJECT MANAGEMENT CONFERENCE, 2010, : 194 - 198
  • [27] Contract terminology in design-build
    Constr Specifier, 6 (63):
  • [28] New law passed to allow design-build method of project delivery
    不详
    WATER-ENGINEERING & MANAGEMENT, 1996, 143 (07): : 9 - 9
  • [29] The untheoretical joys of design-build
    Sullivan, CC
    ARCHITECTURE, 2003, 92 (11): : 32 - 33
  • [30] A new dimension to design-build
    Williams, C.
    Modern Steel Construction, 2001, 41 (11): : 50 - 55