Two-Agent Single-Machine Scheduling with Resource-Dependent Starting Times

被引:0
|
作者
Liu, Peng [1 ]
Tian, Xiaoyu [1 ]
机构
[1] Shenyang Univ Technol, Sch Management, Shenyang 110870, Peoples R China
基金
中国国家自然科学基金;
关键词
CONSUMPTION; MINIMIZE; MAKESPAN; CONSTRAINT; LATENESS;
D O I
10.1155/2013/805261
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider several two-agent scheduling problems with resource consumption on a single machine, where each of the agents wants to minimize a measure dependent on its own jobs. The starting time of each job of the first agent is related to the amount of resource consumed. The objective is to minimize the total amount of resource consumption of the first agent with the restriction that the makespan or the total completion time of the second agent cannot exceed a given bound U. The optimal properties and the optimal polynomial time algorithms are proposed to solve the scheduling problems.
引用
收藏
页数:5
相关论文
共 50 条
  • [21] Single-machine Scheduling with Resource-Dependent Learning Effect and Deteriorating Jobs
    Fan, Yan-Peng
    Zhao, Chuan-Li
    APPLIED MATERIALS AND TECHNOLOGIES FOR MODERN MANUFACTURING, PTS 1-4, 2013, 423-426 : 2224 - 2227
  • [22] Some two-agent single-machine scheduling problems to minimize minmax and minsum of completion times
    Cao, Xiaoling
    Wu, Wen-Hsing
    Wu, Wen-Hung
    Wu, Chin-Chia
    OPERATIONAL RESEARCH, 2018, 18 (02) : 293 - 314
  • [23] Some two-agent single-machine scheduling problems to minimize minmax and minsum of completion times
    Xiaoling Cao
    Wen-Hsing Wu
    Wen-Hung Wu
    Chin-Chia Wu
    Operational Research, 2018, 18 : 293 - 314
  • [24] Single-machine scheduling with learning effect and resource-dependent processing times in the serial-batching production
    Pei, Jun
    Liu, Xinbao
    Liao, Baoyu
    Pardalos, Panos M.
    Kong, Min
    APPLIED MATHEMATICAL MODELLING, 2018, 58 : 245 - 253
  • [25] Single-Machine Due-Window Assignment and Scheduling with Learning Effect and Resource-Dependent Processing Times
    Wang, Ji-Bo
    Wang, Ming-Zheng
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2014, 31 (05)
  • [26] Two-agent single-machine scheduling with release dates to minimize the makespan
    Yu, Jin
    Liu, Peihai
    Lu, Xiwen
    OPTIMIZATION LETTERS, 2023, 17 (08) : 1915 - 1937
  • [27] Two-agent single-machine scheduling with unrestricted due date assignment
    Yin, Yunqiang
    Cheng, T. C. E.
    Yang, Xiaoqin
    Wu, Chin-Chia
    COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 79 : 148 - 155
  • [28] A two-agent single-machine scheduling problem with late work criteria
    Du-Juan Wang
    Chao-Chung Kang
    Yau-Ren Shiau
    Chin-Chia Wu
    Peng-Hsiang Hsu
    Soft Computing, 2017, 21 : 2015 - 2033
  • [29] A Two-Agent Single-Machine Scheduling Problem with Learning and Deteriorating Considerations
    Wu, Wen-Hsiang
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [30] A tabu method for a two-agent single-machine scheduling with deterioration jobs
    Wu, Wen-Hsiang
    Xu, Jianyou
    Wu, Wen-Hung
    Yin, Yunqiang
    Cheng, I-Fan
    Wu, Chin-Chia
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (08) : 2116 - 2127