共 50 条
- [12] Two-agent single-machine scheduling to minimize resource consumption with a constraint on the makespan PROCEEDINGS OF 2013 6TH INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING (ICIII 2013) VOL 1, 2013, : 487 - 489
- [13] Two-agent single-machine scheduling with cumulative deterioration 4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2019, 17 (02): : 201 - 219