Two-Agent Single-Machine Scheduling with Resource-Dependent Starting Times

被引:0
|
作者
Liu, Peng [1 ]
Tian, Xiaoyu [1 ]
机构
[1] Shenyang Univ Technol, Sch Management, Shenyang 110870, Peoples R China
基金
中国国家自然科学基金;
关键词
CONSUMPTION; MINIMIZE; MAKESPAN; CONSTRAINT; LATENESS;
D O I
10.1155/2013/805261
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider several two-agent scheduling problems with resource consumption on a single machine, where each of the agents wants to minimize a measure dependent on its own jobs. The starting time of each job of the first agent is related to the amount of resource consumed. The objective is to minimize the total amount of resource consumption of the first agent with the restriction that the makespan or the total completion time of the second agent cannot exceed a given bound U. The optimal properties and the optimal polynomial time algorithms are proposed to solve the scheduling problems.
引用
收藏
页数:5
相关论文
共 50 条
  • [1] Two-agent scheduling with linear resource-dependent processing times
    Wang, Dujuan
    Yu, Yugang
    Qiu, Huaxin
    Yin, Yunqiang
    Cheng, T. C. E.
    NAVAL RESEARCH LOGISTICS, 2020, 67 (07) : 573 - 591
  • [2] Two-agent single-machine scheduling with position-dependent processing times
    Peng Liu
    Xiaoye Zhou
    Lixin Tang
    The International Journal of Advanced Manufacturing Technology, 2010, 48 : 325 - 331
  • [3] Two-agent single-machine scheduling with position-dependent processing times
    Liu, Peng
    Zhou, Xiaoye
    Tang, Lixin
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 48 (1-4): : 325 - 331
  • [4] Two-agent single-machine scheduling with release times and deadlines
    Yin, Yunqiang
    Cheng, Shuenn-Ren
    Cheng, T. C. E.
    Wu, Wen-Hung
    Wu, Chin-Chia
    INTERNATIONAL JOURNAL OF SHIPPING AND TRANSPORT LOGISTICS, 2013, 5 (01) : 75 - 94
  • [5] Single-machine scheduling with learning effect and resource-dependent processing times
    Wang, Dan
    Wang, Ming-Zheng
    Wang, Ji-Bo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 59 (03) : 458 - 462
  • [6] A Note on Two-Agent Scheduling with Resource Dependent Release Times on a Single Machine
    Liu, Peng
    Duan, Lini
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2015, 2015
  • [7] A study of the single-machine two-agent scheduling problem with release times
    Wu, Chin-Chia
    Wu, Wen-Hung
    Chen, Juei-Chao
    Yin, Yunqiang
    Wu, Wen-Hsiang
    APPLIED SOFT COMPUTING, 2013, 13 (02) : 998 - 1006
  • [8] Two-Agent Single-Machine Scheduling of Jobs with Time-Dependent Processing Times and Ready Times
    Kung, Jan-Yee
    Chao, Yuan-Po
    Lee, Kuei-I
    Kang, Chao-Chung
    Lin, Win-Chin
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [9] Single-machine scheduling with resource-dependent processing times and multiple unavailability periods
    Byung-Cheon Choi
    Myoung-Ju Park
    Journal of Scheduling, 2022, 25 : 191 - 202
  • [10] Single-machine scheduling time-dependent jobs with resource-dependent ready times
    Zhu, Valerie C. Y.
    Sun, Linyan
    Sun, Linhui
    Li, Xiaohong
    COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 58 (01) : 84 - 87