Blasting Demolition Technology and Vibration Testing of 210m Reinforced Concrete Chimney

被引:0
|
作者
Xu, Shunxiang [1 ,3 ]
Chen, Dezhi [2 ,3 ]
机构
[1] Wuhan Univ Sci & Technol, Wuhan 430081, Peoples R China
[2] Wuhan Safety & Environm Protect Res Inst, Wuhan 430081, Peoples R China
[3] Wuhan Univ Technol, Wuhan 430070, Peoples R China
关键词
Chimney; Directional blasting; Electronic digital detonator; Overlarge oriented window; comprehensive protection;
D O I
10.4028/www.scientific.net/AMM.226-228.986
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
This paper describes the successful experience of the directional control blasting of 210m-high reinforced concrete chimney of Nanchang Power Plant in Jiangxi Province called as "First height in Asia". It emphatically describes the pretreatment measures, blasting cut shape and size, blasting parameters, electronic digital detonator detonating network and blasting safety technology. And the blasting vibration was tested and analyzed, and this paper presents the method for opening the arch overlarge oriented window and comprehensive protection method for anti-flyrock splash, vibration reduction and dustfall. Especially, the electronic digital detonator was first applied in the blasting demolition of 210m-high structures, it improves the delay precision and also has a good anti-stray current effect to ensure that the blasting can be safely implemented in the power plant, and it has a good application prospect in the future large-scale and high level complex engineering blasting.
引用
收藏
页码:986 / +
页数:2
相关论文
共 45 条
  • [21] Blasting Demolition Technology and Vibration Monitoring of Two 90m-high Cooling Towers in Complex Environment
    Xu, Shun Xiang
    Chen, De Zhi
    MANUFACTURING ENGINEERING AND AUTOMATION II, PTS 1-3, 2012, 591-593 : 2095 - +
  • [22] Study on damage surveying of cutting-support of high reinforced concrete chimney demolished by blasting
    Zheng, Bingxu
    Wei, Xiaolin
    Chen, Qingshou
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2006, 25 (SUPPL. 2): : 3513 - 3517
  • [23] Green and recyclable demolition of steel reinforced concrete: Application and calculation model of induction heating demolition technology
    Xu, Chonghao
    Zheng, Wenzhong
    Wang, Ying
    Zhou, Xianyu
    Li, Zhiming
    JOURNAL OF BUILDING ENGINEERING, 2022, 61
  • [24] ELASTIC MODEL OF REINFORCED-CONCRETE CHIMNEY FOR WIND-TUNNEL TESTING
    TAMURA, Y
    NISHIMURA, I
    JOURNAL OF WIND ENGINEERING AND INDUSTRIAL AERODYNAMICS, 1990, 33 (1-2) : 231 - 236
  • [25] Green demolition technology of reinforced concrete slab: Application of soundless chemical demolition agents and its evaluation system
    Jiang, Zhisheng
    Zheng, Wenzhong
    Wang, Ying
    Li, Sheng
    Sun, Linqi
    STRUCTURAL CONCRETE, 2023, 24 (04) : 4549 - 4564
  • [26] Demolition technique of high thin-wall hyperbolic reinforced concrete cool tower by directional controlled blasting
    Luo Yong1
    2.Guangdong Handar Blasting Engineering Co.
    Engineering Sciences, 2008, 6 (04) : 40 - 45
  • [27] Vibration based modal testing of a scaled reinforced concrete building for construction stages
    Turker, Temel
    Bayraktar, Alemdar
    BULLETIN OF EARTHQUAKE ENGINEERING, 2017, 15 (08) : 3399 - 3416
  • [28] Impact and ambient vibration testing to assess structural damage in reinforced concrete frames
    Villemure, I
    Ventura, CE
    Sexsmith, RG
    PROCEEDINGS OF THE 14TH INTERNATIONAL MODAL ANALYSIS CONFERENCE, VOLS I & II, 1996, 2768 : 1178 - 1184
  • [29] Vibration based modal testing of a scaled reinforced concrete building for construction stages
    Temel Türker
    Alemdar Bayraktar
    Bulletin of Earthquake Engineering, 2017, 15 : 3399 - 3416
  • [30] MODELING AND APPLICATION OF GPR DETECTION TECHNOLOGY IN REINFORCED CONCRETE DEFECTS TESTING
    Tu, Wen-Ge
    Chen, Li-Qing
    He, Fang-Long
    PROCEEDINGS OF THE TENTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING FOR YOUNG EXPERTS, VOLS I AND II, 2008, : 1563 - 1568