共 50 条
- [25] The latest in unlined auxiliary spillway design REDUCING RISK FROM EXTREME EVENTS, 2003, : 321 - 330
- [26] Ashton stepped spillway - Design and construction HYDRAULICS OF STEPPED SPILLWAYS, 2000, : 35 - 41
- [27] Emergency spillway design for Wangfuzhou hydroproject 2001, Yangtze River Scientific Research Institute (32):
- [29] Spillway capacity upgrade at Malarce dam: Design of an additional Piano Key Weir spillway LABYRINTH AND PIANO KEY WEIRS - PKW 2011, 2011, : 233 - 240