Emergency spillway design for Wangfuzhou hydroproject

被引:0
|
作者
机构
来源
| 2001年 / Yangtze River Scientific Research Institute卷 / 32期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
The emergency spillway for Wangfuzhou hydroproject is constructed on the earth and rockfill dam crossing the main river channel and blocked with a 12 m high sand gravel dam. The river bed is composed of sand and gravel. The emergency spillway is 415.6 m wide, with maximum discharge of 4 960 m3/s. The dynamite chambers are reserved in the blockage and it will be exploded for emergency flood diversion. The upstream water level should be controlled during flood diversion and the adjacent structures along the sides of the spillway should be protected. The exploded blockage will be reconstructed after flood season. The main problems to be solved in the design include the site selection of emergency spillway, dam structure, seepage prevention mode, scour prevention measures etc.
引用
收藏
相关论文
共 50 条
  • [1] Development of the design for the No. 2 Spillway at the Boguchany hydroproject
    Toloshinov A.V.
    Volynchikov A.N.
    Prokof'ev V.A.
    Sudol'skii G.A.
    Power Technol. Eng., 2009, 3 (135-142): : 135 - 142
  • [2] Tolerance of cavitation damages in developing requirements for spillway surfaces at the irgana hydroproject
    Abdarakhmanov M.A.
    Kostin V.V.
    Nikulin D.A.
    Shvainshtein A.M.
    Korotkov N.N.
    Shkuropat A.G.
    Power Technology and Engineering, 2011, 45 (2) : 100 - 108
  • [3] Study on design flood of Zaoshi hydroproject
    Hu, Y.-L.
    Guo, H.-J.
    Bian, W.
    Renmin Changjiang/Yangtze River, 2001, 32 (12):
  • [4] Construction diversion design for Siping hydroproject
    Rao, Z.-W.
    Wu, W.-X.
    Zhan, J.-H.
    Renmin Changjiang/Yangtze River, 2001, 32 (10):
  • [5] Characteristic features of the cap on the service spillway at the Bureya hydroproject and some results of its laboratory and field investigations
    Vasil'Ev A.V.
    Kokurin S.A.
    Kozlov A.B.
    Deryugin G.K.
    Power Technology and Engineering, 2011, 45 (3) : 171 - 174
  • [6] DESIGN OF SPILLWAY CRESTS
    REESE, AJ
    MAYNORD, ST
    JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1987, 113 (04): : 476 - 490
  • [7] Diversion tunnel design for Shuibuya hydroproject on Qingjiang river
    Chen, C.-M.
    Zhan, J.-H.
    Wang, X.-M.
    Renmin Changjiang/Yangtze River, 2001, 32 (10):
  • [8] Stop logs for emergency spillway gate dewatering
    Freckleton, Derek R.
    Johnson, Michael C.
    Leslie Boyd, M.
    Mortensen, Dustin G.
    Journal of Hydraulic Engineering, 2012, 137 (06) : 644 - 650
  • [9] Emergency and permanent repair of Apanas Spillway - Nicaragua
    Lovoll, A
    Helgesen, KD
    DAMS IN A EUROPEAN CONTEXT, 2001, : 459 - 466
  • [10] Design guidelines for spillway gates
    Sehgal, CK
    JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1996, 122 (03): : 155 - 165