Self-start, voltage and start-up power application from Dychow hydro-electric power plant to Dolna Odra power plant-system control tests

被引:0
|
作者
Grzadzielski, Ireneusz [1 ]
Sroka, Krzysztof [1 ]
Marszalkiewicz, Krzysztof [1 ]
机构
[1] Politechn Poznanska, Inst Elektroenergetyki, PL-60965 Poznan, Poland
来源
PRZEGLAD ELEKTROTECHNICZNY | 2012年 / 88卷 / 9A期
关键词
power system; blackout; blackstart; power plant;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
According to the plan of defense and post-blackout restitution of the National Electric Power System (KSE), restitution of the thermal power plant's blocks is a priority. Due to a catastrophic breakdown, the blocks of the thermal power plant will change over either to own auxiliary operation or to the emergency outage. In the power plants, where the second case will occur, the blocks must be started up urgently from a source with the self-starting capability. In the western area of KSE, Dychow hydro-electric power plant (EW Dychow) plays the role of the starting-up source. In the paper, the control tests results and system trial carried out at the beginning of July 2011 that confirmed the power plant's capability to participate in the restitution of the KSE are presented. (Self-start, voltage and start-up power application from Dychow hydro-electric power plant to Dolna Odra power plant - system control tests).
引用
收藏
页码:16 / 21
页数:6
相关论文
共 50 条
  • [21] PRINCIPLES AND RESULTS OF AUTOMATIC CONTROL SYSTEM START-UP IN RHEINSBERG NUCLEAR POWER PLANT PROBLEMS OF DEVELOPMENT
    SCHUMACH.G
    KERNENERGIE, 1971, 14 (04): : 107 - &
  • [22] Electric power fossil plant start-up combining predictive control and Takagi-Sugeno fuzzy modelling
    Sanchez, EN
    Moheno, M
    Suarez, DA
    Quintero, A
    PROCEEDINGS OF THE 2002 IEEE INTERNATIONAL SYMPOSIUM ON INTELLIGENT CONTROL, 2002, : 116 - 120
  • [23] Start-Up Optimization of Combined Cycle Power Plants: A Field Test in a Commercial Power Plant
    Yoshida, Yasuhiro
    Yoshida, Takuya
    Enomoto, Yuki
    Osaki, Nobuhiro
    Nagahama, Yoshito
    Tsuge, Yoshifumi
    JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2019, 141 (03):
  • [24] The preparations, course and results of the system test in which a hydroelectric power plant was used to start-up a thermal unit in a baseload power plant
    Kaczmarek, Marcin
    Kurzynski, Adam
    Surlej, Marcin
    Brzozowski, Michal
    PRZEGLAD ELEKTROTECHNICZNY, 2019, 95 (02): : 11 - 18
  • [25] Siemens optimizes start-up sequences in a power plant unit - New unit start-up simulator reduces costs
    Zaviska, O.
    Reichel, H.
    VGB PowerTech, 2001, 81 (07): : 4 - 5
  • [26] Mathematical Model of a Residential Fuel Cell Power Plant and its Application to Start-up Optimisation
    Jahn, H-J
    Schroer, W.
    FUEL CELLS, 2004, 4 (04) : 276 - 282
  • [27] Optimization of start-up process in combined cycle steam turbine of a power plant
    Ding, Y. (dyj1987214@126.com), 1600, Chinese Society for Electrical Engineering (33):
  • [28] Yadana field start-up delayed again over power plant woes
    不详
    OIL & GAS JOURNAL, 1999, 97 (35) : 42 - 42
  • [29] Dynamic optimization method for start-up scheduling of a combined cycle power plant
    Shirakawa, Masakazu
    Nakamoto, Masashi
    Nippon Kikai Gakkai Ronbunshu, B Hen/Transactions of the Japan Society of Mechanical Engineers, Part B, 2002, 68 (672): : 2377 - 2384
  • [30] Construction and start-up of combined heat and power plant at the Julich sugar factory
    Lorenz, M
    ZUCKERINDUSTRIE, 2005, 130 (08): : 628 - 635